@codetreker/daynight 0.17.2 → 0.17.3

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
@@ -14,11 +14,12 @@ a mainline branch.
14
14
 
15
15
  When this skill and Daynight are available, use Daynight to manage concrete work
16
16
  with a defined objective and completion conditions: features, bug fixes,
17
- architecture/design work, and actual work items produced by their breakdown.
18
- An agent's transient execution steps, such as reading files, running commands,
19
- and routine checks, belong in its execution plan; their presence in a plan does
20
- not make them Daynight tasks. Use the owning Daynight task for every solution,
21
- architecture, and design review.
17
+ architecture/design work, actual work items produced by their breakdown, and
18
+ independently scoped [final acceptance](#final-acceptance). An agent's transient
19
+ execution steps, such as reading files, running commands, and routine checks,
20
+ belong in its execution plan; their presence in a plan does not make them
21
+ Daynight tasks. Use the owning Daynight task for every solution, architecture,
22
+ and design review.
22
23
 
23
24
  Before asking the user to review any solution, architecture, design, or related
24
25
  discussion, save the complete current review material in the owning task's
@@ -33,6 +34,33 @@ Confirm the CLI, configured service, and intended project are accessible using
33
34
  the handbook's discovery rules. Preserve actual availability or upload failures;
34
35
  do not claim materials are ready for review until the saved contents are verified.
35
36
 
37
+ ## Final acceptance
38
+
39
+ Final acceptance determines whether the complete requested task or Goal satisfies
40
+ its confirmed requirements. Define that outcome explicitly when creating or
41
+ breaking down work. Deliver the requirement-based conclusion, supporting evidence,
42
+ defects, and unverified items on the owning task. Record the verification methods,
43
+ tested source and environment, observations, and material limits.
44
+
45
+ Use manual verification, existing checks, or temporary helper scripts as
46
+ appropriate. Keep final-acceptance helpers in the project's temporary area and
47
+ uncommitted. Do not integrate them into repository tests, fixtures, runners, CI,
48
+ or tooling, or make building a maintained verification system the acceptance
49
+ deliverable. Review findings about a helper do not authorize that change of scope.
50
+
51
+ Complete acceptance according to the confirmed whole-task or whole-Goal criteria.
52
+ Finishing or passing helper scripts does not establish that the requested work is
53
+ complete. Do not report the underlying task or Goal as accepted while required
54
+ outcomes remain unmet or unverified. Verify necessary implementation deliveries
55
+ and PR merges as inputs; do not create a separate PR requirement for acceptance
56
+ helpers. Handle discovered product defects within the authorized implementation
57
+ scope.
58
+
59
+ Implementation and authorized defect-fix tasks retain their normal unit,
60
+ integration, and regression tests and required repository checks. A user-requested
61
+ maintained testing or automation capability is a development deliverable governed
62
+ by its own confirmed scope; do not infer it from a final-acceptance assignment.
63
+
36
64
  ## Select a mode
37
65
 
38
66
  The following are skill modes, not additional CLI commands. Read the selected
@@ -25,8 +25,14 @@ under the entrypoint's required tracking and review rules.
25
25
  Keep an agent's transient execution steps, such as reading files, running
26
26
  commands, and routine checks, in the existing execution plan. Do not turn these
27
27
  steps into Daynight tasks merely because an agent generated them. A distinct
28
- acceptance or validation assignment with its own outcome can still be a task;
29
- running a check while delivering an existing task is an execution step. If the
28
+ acceptance or validation assignment with its own outcome can still be a task.
29
+ For [final acceptance](../SKILL.md#final-acceptance), identify the entire task or
30
+ Goal being assessed and its confirmed requirement sources. Define the deliverable
31
+ as the acceptance conclusion, evidence, defects, and unverified items. Apply the
32
+ shared rule to temporary helpers; do not make their development or repository
33
+ delivery the acceptance outcome.
34
+
35
+ Running a check while delivering an existing task is an execution step. If the
30
36
  request contains only execution steps for existing work, keep them with that
31
37
  work and return without registering additional tasks.
32
38
 
@@ -114,8 +114,11 @@ Only after user solution confirmation, create or reuse the concrete delivery tas
114
114
  needed for the agreed outcome. Each needs its own problem, objective, scope,
115
115
  deliverables, constraints, solution, observable acceptance, verification methods,
116
116
  and real input references. Include independently scoped acceptance work when it
117
- has its own outcome; do not turn agent-generated execution steps into tasks.
118
- The combined scope must cover the confirmed Goal, rather than a vague placeholder.
117
+ has its own outcome. A [final-acceptance](../SKILL.md#final-acceptance) brief
118
+ identifies the original whole-Goal requirements and confirmed changes, and assesses
119
+ the combined delivery under the shared rule. Do not turn agent-generated execution
120
+ steps into tasks. The combined scope must cover the confirmed Goal, rather than a
121
+ vague placeholder.
119
122
 
120
123
  Create new delivery tasks in `todo`. Solution confirmation authorizes the
121
124
  confirmed breakdown's registration, not implementation, autopilot,
@@ -220,7 +223,12 @@ waits stay with the current delivery task.
220
223
  Delivery tasks follow normal run-task completion: accepted outcomes, required
221
224
  review, all necessary authorized PR merges, and readable evidence. To report the
222
225
  whole Goal complete, inspect the full confirmed delivery scope, every delivery
223
- task's completion, all required PR merges, and the original whole-Goal acceptance.
226
+ task's completion, all required delivery PR merges, and the original
227
+ whole-Goal requirements with their confirmed changes. Apply
228
+ [Final acceptance](../SKILL.md#final-acceptance) to the combined delivery and its
229
+ evidence; completing or passing temporary helpers does not establish that the
230
+ Goal is complete.
231
+
224
232
  The requirements task being done means only that requirements discussion is
225
233
  complete. The solution task being done means the confirmed solution and verified
226
234
  breakdown are delivered. An empty ready page or a single delivery result proves
@@ -79,6 +79,11 @@ Preserve the requested task ID through recovery and waiting.
79
79
 
80
80
  ## Execute and maintain continuity
81
81
 
82
+ Identify [final acceptance](../SKILL.md#final-acceptance) from the task's confirmed
83
+ outcome before applying a development or PR delivery lifecycle. Read the complete
84
+ requirements and actual deliveries for the task or Goal being assessed, and apply
85
+ the shared rule to verification methods, temporary helpers, and result ownership.
86
+
82
87
  Follow the target repository's instructions for worktrees, implementation,
83
88
  review, validation, and delivery. Use the task's stage-appropriate solution and
84
89
  acceptance criteria, including applicable final-style prototype interactions.
@@ -139,8 +144,10 @@ unavailable merge visibility, or an unmet merge check likewise keeps completion
139
144
  pending and successors blocked.
140
145
 
141
146
  For tasks without a development or PR delivery path, use their stated stage
142
- acceptance. In every case, confirm required evidence is recorded and readable,
143
- then reread the complete in-progress task and use `task set-status <task-id> done` with its exact
147
+ acceptance. For [final acceptance](../SKILL.md#final-acceptance), also apply the
148
+ shared whole-task or whole-Goal completion rule. In every case, confirm required
149
+ evidence is recorded and readable, then reread the complete in-progress
150
+ task and use `task set-status <task-id> done` with its exact
144
151
  observed version. For Goal discussions, use their confirmation gates and verified
145
152
  accepted materials; for delivery tasks, use their acceptance and required authorized PR
146
153
  merges.
package/package.json CHANGED
@@ -1,6 +1,6 @@
1
1
  {
2
2
  "name": "@codetreker/daynight",
3
- "version": "0.17.2",
3
+ "version": "0.17.3",
4
4
  "description": "A client command toolkit for development workflows",
5
5
  "repository": {
6
6
  "type": "git",
@@ -47,5 +47,5 @@
47
47
  "vite": "8.3.4",
48
48
  "vitest": "5.0.5"
49
49
  },
50
- "gitHead": "4a180560daa419b472855ede25fc7b69d208d1e4"
50
+ "gitHead": "41080e8c89c23c94d6ec83848bd2b3675c884b04"
51
51
  }