@bridge_gpt/mcp-server 0.2.19 → 0.2.21

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (35) hide show
  1. package/README.md +6 -3
  2. package/build/agents.generated.js +1 -1
  3. package/build/commands.generated.js +4 -3
  4. package/build/conductor/local-merge.js +458 -95
  5. package/build/estimate-epic.js +84 -0
  6. package/build/executor/job-runner.js +151 -17
  7. package/build/executor/merge-job.js +84 -10
  8. package/build/executor/worker-finalization.js +98 -18
  9. package/build/index.js +1843 -401
  10. package/build/pipelines.generated.js +16 -20
  11. package/build/readme.generated.js +1 -1
  12. package/build/review-tickets.js +15 -5
  13. package/build/sfcc/client.js +192 -50
  14. package/build/sfcc/ocapi-write-faults.js +94 -0
  15. package/build/sfcc/permissions.js +7 -22
  16. package/build/sfcc/register.js +9 -0
  17. package/build/sfcc/write-grants.js +80 -0
  18. package/build/sfcc/write-guard.js +39 -0
  19. package/build/sfcc/write-result.js +47 -0
  20. package/build/sfcc/write-tool-common.js +85 -0
  21. package/build/sfcc/writes-custom-object-def.js +141 -0
  22. package/build/sfcc/writes-object-attribute-payloads.js +97 -0
  23. package/build/sfcc/writes-site-preference-payloads.js +59 -0
  24. package/build/sfcc/writes-site-preference.js +96 -0
  25. package/build/sfcc/writes-system-object-payloads.js +213 -0
  26. package/build/sfcc/writes-system-object.js +348 -0
  27. package/build/sfcc/writes.js +66 -0
  28. package/build/version.generated.js +1 -1
  29. package/package.json +3 -3
  30. package/pipelines/idea-to-ticket.json +7 -0
  31. package/pipelines/review-ticket.json +5 -18
  32. package/public/css/main.min.css +1583 -117
  33. package/public/css/main.min.css.map +1 -1
  34. package/public/js/main.min.js +2792 -449
  35. package/public/js/main.min.js.map +1 -1
@@ -106,6 +106,13 @@ export const PIPELINES = {
106
106
  "instruction_file": "frame-goals-and-nfrs.md",
107
107
  "description": "Frame business goals, desired end-state, and non-functional requirements (documentary)"
108
108
  },
109
+ {
110
+ "id": "comp-analysis",
111
+ "type": "agent_task",
112
+ "instruction_file": "comp-analysis.md",
113
+ "description": "Analyze any design comp and map it to existing codebase components/templates/tokens/routes (gated, backend-safe)",
114
+ "on_error": "warn_and_continue"
115
+ },
109
116
  {
110
117
  "type": "agent_task",
111
118
  "instruction_file": "draft-and-critique.md",
@@ -558,13 +565,14 @@ export const PIPELINES = {
558
565
  },
559
566
  "review-ticket": {
560
567
  "name": "review-ticket",
561
- "description": "Review a ticket with two rounds of analysis (initial + automatic second opinion by default), evaluate suggestions for accuracy, and produce a combined review-and-resolution document with decision trees. The automatic second-opinion step is skippable via --rounds=1 mode (skip_steps: [\"second-opinion-review\"]).",
568
+ "description": "Review a ticket, evaluate suggestions for accuracy, and produce a combined review-and-resolution document with decision trees. A single request_ticket_review step runs the backend's resolved difficulty-adaptive review policy, which internally runs any second-opinion rounds server-side. Pass --rounds=1|2 to forward an explicit round count that forces the review shape (1 = single pass, 2 = full second-opinion review); omit it to let the backend policy executor decide adaptively.",
562
569
  "variables": [
563
570
  "ticket_key",
564
571
  "docs_dir",
565
572
  "base_branch",
566
573
  "base_sha",
567
- "no_refresh_base"
574
+ "no_refresh_base",
575
+ "rounds"
568
576
  ],
569
577
  "steps": [
570
578
  {
@@ -580,23 +588,10 @@ export const PIPELINES = {
580
588
  "ticket_number": "{ticket_key}",
581
589
  "wait_for_result": true,
582
590
  "save_locally": true,
583
- "provider": "{provider}"
584
- },
585
- "description": "Generate combined clarify+critique review (initial)",
586
- "on_error": "warn_and_continue"
587
- },
588
- {
589
- "type": "mcp_call",
590
- "id": "second-opinion-review",
591
- "tool": "request_ticket_review",
592
- "params": {
593
- "ticket_number": "{ticket_key}",
594
- "second_opinion": "auto",
595
- "wait_for_result": true,
596
- "save_locally": true,
597
- "provider": "{provider}"
591
+ "provider": "{provider}",
592
+ "rounds": "{rounds}"
598
593
  },
599
- "description": "Generate combined clarify+critique review (second opinion)",
594
+ "description": "Generate combined clarify+critique review. The backend runs the resolved difficulty-adaptive policy (including any second-opinion rounds) server-side; an explicit rounds value (1|2) forces the shape.",
600
595
  "on_error": "warn_and_continue"
601
596
  },
602
597
  {
@@ -690,10 +685,11 @@ export const INSTRUCTIONS = {
690
685
  "capture-review-decisions.md": "Capture user decisions on review findings for {ticket_key} using the HTML decision page, then interpretively rewrite the clarifying questions and critique docs and upload both to Jira.\n\n## Step 1: Read source documents\n\nRead the combined review-and-resolution file:\n- `{docs_dir}/review/{ticket_key}-review-and-resolution.md`\n\nIf the file does not exist or is unreadable, stop and report: \"Combined review-and-resolution file not found or unreadable. Run the earlier pipeline steps first.\"\n\nThe combined file existing but containing no actionable items (empty `Needs Scrutiny` and `Open Questions` sections) is **not** a failure condition — Step 4 handles the no-decisions-needed flow gracefully when `generate_decision_page` is called with empty `actionable_items`.\n\n## Step 2: Map evaluation items to decision page input\n\nTransform the combined review-and-resolution document into `generate_decision_page` JSON input using these mapping rules:\n\n| Evaluation Section | JSON Field | Mapping Rule |\n|---|---|---|\n| Open Questions | `actionable_items` | E-item title → `question`, `**Source**` → `source`, `**Original question**` → `original_question`, `**Why it matters**` → `why_it_matters`, decision tree branch labels → `options` (string array, labels only), `**Option consequences**` (parallel to branches) → `option_consequences`, `**Recommendation explanation**` → `recommendation_explanation`, combined `**Assessment**` paragraph and `**Codebase Evidence**` bullet list → `codebase_evidence`, `**Recommendation Index**` → `recommendation_index` |\n| Needs Scrutiny | `actionable_items` | E-item title → `question`, `**Source**` → `source`, `**Original question**` → `original_question`, `**Why it matters**` → `why_it_matters`, decision tree branch labels → `options` (string array, labels only), `**Option consequences**` (parallel to branches) → `option_consequences`, `**Recommendation explanation**` → `recommendation_explanation`, combined `**Assessment**` paragraph and `**Codebase Evidence**` bullet list → `codebase_evidence`, `**Recommendation Index**` → `recommendation_index` |\n| Confirmed Improvements | `clear_improvements` | E-item title → `title`, confidence tag → `confidence`, recommended action → `action`, `**Source**` from the combined file → `source` |\n\n**Important**: The `original_question`, `why_it_matters`, `option_consequences`, `recommendation_explanation`, and the collapsed `codebase_evidence` block together replace the old single `context` blob. Each clarity field guides a different facet of the user's decision: `original_question` reminds the reviewer what was asked, `why_it_matters` frames the impact, `option_consequences` describe the behavioral outcome of each branch, `recommendation_explanation` motivates the recommended branch, and the closed-by-default `codebase_evidence` block surfaces the Assessment + file:line citations on demand without overwhelming the card.\n\nFor each actionable item, the `options` array is a list of plain label strings extracted from the combined file's decision tree branches. The tool auto-generates value keys (`opt-0`, `opt-1`, etc.) and auto-appends a \"None of these\" option. Do not generate value keys yourself.\n\n## Step 2.5: Auto-approve fast path\n\nFor this run, `auto_approve` = `{auto_approve}`.\n\nIf `auto_approve` is `true` and Step 2 produced at least one actionable item, skip Steps 3–6 entirely and synthesize the commit JSON directly:\n\n- `ticket_key`: `{ticket_key}`\n- `general_comment`: `\"\"`\n- `decisions`: an object keyed by each `actionable_items[*].id` from Step 2's mapped input. For each item:\n - If `recommendation_index` is a non-negative integer within range of `options`: `choice = \"opt-\" + recommendation_index`, `chosen_label = options[recommendation_index]`, `comment = \"\"`, `source` copied from the item.\n - Otherwise (missing, null, or out of range): `choice = \"opt-0\"`, `chosen_label = options[0]`, `comment = \"\"`, `source` copied. Never emit `\"none\"` and never emit `\"ask\"`.\n\nPost a single chat acknowledgement listing each auto-approved item ID and chosen label, then proceed directly to Step 7 with the synthesized JSON. Step 7's \"Hard rule\" about resolving `ask` items does not apply because no item carries `choice === \"ask\"`.\n\nIf Step 2 produced zero actionable items, fall through to Step 3 — Step 4's existing `no_decisions_needed` branch handles the empty case correctly.\n\nOtherwise (any value of `auto_approve` other than the literal `true` — including empty, `false`, or missing), proceed to Step 3.\n\n## Step 3: Call the MCP tool\n\nCall `generate_decision_page` with `ticket_key` at the root and the review arrays nested under `content`:\n\n```typescript\ninterface ReviewDecisionsContent {\n actionable_items?: Array<{\n id: string;\n question: string;\n why_it_matters: string; // required — concrete one-sentence impact\n recommendation_explanation: string; // required — why the recommended branch is best\n options: string[]; // 2-4 option labels\n option_consequences: string[]; // same length as options\n recommendation_index: number; // 0-based index into options\n original_question?: string; // optional display field\n codebase_evidence?: string; // optional display field — assessment + file:line\n source?: string; // optional source reference\n }>;\n clear_improvements?: Array<{\n id: string;\n title: string;\n action: string;\n confidence: string;\n source: string; // required for clear_improvements\n }>;\n}\n```\n\nExample call:\n```json\n{\n \"ticket_key\": \"{ticket_key}\",\n \"content\": {\n \"actionable_items\": [\n {\n \"id\": \"E-1\",\n \"question\": \"Should we add a configurable timeout?\",\n \"why_it_matters\": \"Timeout behavior affects retry paths and user-visible latency.\",\n \"recommendation_explanation\": \"Configurable matches existing latency-branching code.\",\n \"options\": [\"Keep existing\", \"Add configurable timeout\"],\n \"option_consequences\": [\"No new work.\", \"Implementers add config + tests.\"],\n \"recommendation_index\": 1,\n \"original_question\": \"Does the ticket specify timeout behavior?\",\n \"source\": \"Clarifying Q1\"\n }\n ],\n \"clear_improvements\": [\n { \"id\": \"ci-1\", \"title\": \"Tidy logging\", \"action\": \"Use the logger.\", \"confidence\": \"high\", \"source\": \"Eval 1\" }\n ]\n }\n}\n```\n\n## Step 4: Check tool response\n\nThe tool returns a JSON response with a `status` field:\n- If `status` is `\"no_decisions_needed\"`: skip Steps 5, 6, 7, and 8 entirely. Output a success message: \"No actionable review decisions needed — skipping doc rewrite and upload.\" This covers both the case where every item was confirmed as a Confirmed Improvement and the case where no items were emitted (e.g., both upstream source documents were absent).\n- If `status` is `\"decision_page_generated\"`: continue to Step 5. The response includes `file_path`.\n\n## Step 5: Direct user to the decision page\n\nTell the user to open the generated HTML file in their browser. Provide the `file_path` from the tool response. Then say to the user, verbatim: `Open the page. For any item you're unsure about, choose \"Ask about this\" — when you submit, I'll talk through those before we proceed. You can also ask me questions in chat before submitting if you prefer.`\n\nThis step only directs the user to the page and explains the two allowed next actions (submit selections, or ask questions first). Do not describe Step 7's rewrite semantics here; that belongs to the rewrite step.\n\n## Step 6: Q&A loop and commit signal\n\nEnter an open-ended Q&A loop. There is no turn cap — the user may ask any number of questions in any number of turns. Do not stop and wait silently; engage with each user message as either a commit signal or a discussion turn.\n\n### Proceed signal (commit)\n\nTrim the full user message and attempt to parse the entire trimmed message as JSON. The message is a commit only when the parsed value is an object with all three of these top-level fields:\n\n- `ticket_key` — must be a string\n- `decisions` — must be an object\n- `general_comment` — must be a string\n\nThe first valid commit-shaped JSON paste commits immediately. Proceed to Step 7 without prompting for additional confirmation. Any combination of `decisions` keys is accepted (the page may submit a partial set if the user only resolved some items conversationally). Do not over-validate the per-card fields beyond the top-level commit-shape check — the page guarantees the per-card schema, and over-validating risks rejecting valid pastes if the page schema evolves.\n\n### Discussion signal (Q&A turn)\n\nAnything that is not commit-shaped JSON is a discussion turn. This includes:\n\n- Freeform questions (with or without other text).\n- Questions pasted alongside other text or alongside JSON.\n- Malformed JSON (parse failure).\n- Well-formed JSON missing one or more of the required top-level keys (`ticket_key`, `decisions`, `general_comment`).\n\nFor JSON-shaped input that is missing required top-level fields, call this out in the reply — explain which fields are missing and ask whether the user intended to submit or share partial state — rather than silently treating it as a freeform question.\n\nAnswer discussion turns using these sources, in priority order:\n\n1. The combined `{ticket_key}-review-and-resolution.md` file already read in Step 1.\n2. The original `{ticket_key}-clarifying-questions.md` and `{ticket_key}-ticket-quality-critique.md` documents.\n3. Codebase lookups when the question requires verifying current code state.\n\nFallback: if running on a pre-PR1 branch where the combined review-and-resolution document does not exist, use the pre-PR1 `{ticket_key}-review-evaluation.md` and `{ticket_key}-resolution-guide.md` pair in its place.\n\nFor plain freeform questions, infer the item from chat context when possible.\n\n### In-flight decision state\n\nDuring the Q&A loop, maintain in-flight JSON state — agent-owned working memory representing the user's current intent for `decisions` and `general_comment`. This in-flight JSON state lives only in the agent's working memory for the duration of the loop; do not persist it server-side.\n\n- When the user clearly changes their mind about an item, chooses an option conversationally with reasonably explicit decision language (\"choose option B for E-3\", \"go with the configurable timeout\", \"change E-7 to None of these\"), or gives new overarching guidance, record that as an in-flight override.\n- Ambiguous preference language (\"I'm leaning toward...\", \"maybe option B is fine\") should be discussed but not recorded as an override unless the user gives reasonably explicit decision language.\n- `general_comment` may be updated in the in-flight state when the user gives overarching guidance during Q&A.\n- The page's general-comment textarea is preserved unchanged. Do not modify the page DOM during Q&A; the user can still fill the textarea before submitting if they prefer.\n\nOn the eventual JSON commit, the user-submitted JSON is the baseline and the recorded in-flight overrides take precedence over it. Before proceeding to Step 7, post a brief one-line acknowledgement in chat naming each overridden item ID and/or `general_comment`. The acknowledgement is mandatory (not optional) — it is the user's last chance to object before Step 7's document rewrite. The user does not need to re-open, edit, or re-submit the decision page after changing their mind in chat; they can submit the page as-is to provide the commit signal, and the in-flight state remains the source of truth for overrides.\n\n### Ask-about-this resolution\n\nAfter accepting a commit, scan `decisions` for any item where `choice === \"ask\"`. The user has signaled that they need more information before deciding on those items. For each such item:\n\n- If `comment` is non-empty, treat it as the user's specific question or stated uncertainty and answer that directly.\n- If `comment` is empty, proactively present the most relevant missing context — the item's `codebase_evidence`, related code lookups, prior-round answers — and lay out the trade-offs the user appears to need help weighing.\n- Continue the Q&A turn-by-turn until the user gives an explicit decision in chat for that item (\"go with option B\", \"none of these, because …\"). Record that decision as an in-flight override using the same override mechanism described above.\n\n**Hard rule.** Step 7 must not run while any `decisions[*].choice === \"ask\"` remains unresolved by an in-flight override. Do not honor \"just proceed\", \"skip those\", or any other instruction to defer resolution — every `ask` item must end with a recorded `opt-N` or `none` override before the rewrite step. The pre-Step-7 acknowledgement line lists every overridden item, including the ones resolved out of `ask`.\n\n## Step 7: Interpretively rewrite source documents\n\nThe pasted JSON contains a `decisions` object keyed by item ID. Each decision includes `source`, `choice`, `chosen_label`, and `comment`. Use these fields to locate and rewrite the corresponding sections in:\n- `{docs_dir}/clarifying-questions/{ticket_key}-clarifying-questions.md`\n- `{docs_dir}/ticket-critiques/{ticket_key}-ticket-quality-critique.md`\n\nAfter a second-opinion run, each document has this shape:\n\n- A top-level H1 (`# Ticket Analysis` or `# Ticket Quality Critique`) followed by an italic provider-attribution line `_This analysis was generated by GPT|Claude|Gemini._` naming the first-round LLM family. **Preserve this attribution line verbatim** — do not move, edit, or remove it during the rewrite step.\n- The first-round questions / critique items, exactly as written by the first-round model.\n- **Inline second-opinion blockquotes** (`> **Second opinion (<provider>) - concurrence|refinement|disagreement.** ... > *Citations: ...*`) nested directly under each prior item the second round addressed. The `(<provider>)` parenthetical is the second-round LLM family (`GPT|Claude|Gemini`). Items the second round did not comment on have no blockquote — that is the \"weak concurrence\" signal.\n- A **`## New in Second Opinion`** tail block listing items the second round added on top of the first round. Immediately under the H2 there is a second italic attribution line `_These additional points were raised by GPT|Claude|Gemini._` naming the second-round family — **also preserve this verbatim**. Then agent-specific sub-headings:\n - Clarifier docs: `### New Requirements Questions` / `### New Technical Questions` (numbering continues from the prior section).\n - Critique docs: `### New Requested Changes` / `### New Points to Consider` (numbering continues from the prior section).\n- A final **`## Second Opinion Summary`** footer (1-3 sentences). **This footer must be preserved verbatim** — it is the canonical record of the second round's overall position and should not be edited.\n\nThe `source` field on each decision tells you where the item lives:\n\n- `Clarifying Q3 (prior round, weak concurrence)` → the prior section, no inline blockquote. Rewrite the prior item's answer.\n- `Clarifying Q9 (prior round, concurrence inline)` → the prior section, prior item carries an explicit `concurrence` blockquote. Rewrite the prior answer; the blockquote can be removed once the answer absorbs the resolution.\n- `Clarifying Q3 (prior round, refinement inline)` / `(prior round, disagreement inline)` → the prior section, prior item carries an explicit `refinement` or `disagreement` blockquote. Rewrite the prior answer to reconcile the dispute, then handle the blockquote per the rule below.\n- `Clarifying Q11 (new in second opinion → New Requirements Questions)` → the `## New in Second Opinion > ### New Requirements Questions` sub-section. Rewrite the item in place inside that sub-section, not at the top of the prior analysis.\n- Equivalent forms for critique items: `Critique: Requested Change 2 (prior round, refinement inline)`, `Critique: Points to Consider N+1 (new in second opinion → New Points to Consider)`, etc.\n\n**Legacy fallback shape**: if the document instead ends with `\\n\\n---\\n\\n` followed by a `## Second Opinion` section (because the JSON pipeline fell back), apply decisions to the equivalent location: `### Response to Prior Items` for inline-style responses, `### Additional Points > New X` for tail-style new items. Preserve the `\\n\\n---\\n\\n` separator and the `## Second Opinion` heading verbatim.\n\nApply the decision to the item in its home location. Then apply the decision:\n\n### Actionable item decisions\n\n- **Selected option** (`choice` is `opt-N`): Add `**Review Decision**: Accepted. <chosen_label>.` to the corresponding section. Integrate the selected direction into the section text so it reads as a final recommendation or resolved answer.\n- **None of these** (`choice` is `none`): Add `**Review Decision**: Rejected — none of the proposed options accepted.` Include the user's `comment` explaining why. Rewrite the section to reflect this decision.\n\nFor actionable items sourced from clarifying questions, rewrite the question's best-guess answer so it reads as the final resolved direction chosen by the reviewer. Do not leave the item framed as an unresolved accept/reject/modify prompt.\n\nFor items sourced from `(prior round, refinement inline)` or `(prior round, disagreement inline)` — disputes of a prior-round item carried in an inline blockquote — the prior-round item is the canonical home: rewrite its answer to absorb the resolution. Then handle the blockquote in one of two ways: (a) remove the blockquote outright if the rewritten answer fully absorbs the second-opinion content, or (b) shorten the blockquote to a single sentence noting the resolution while preserving the `(<provider>)` attribution (e.g. `> **Second opinion (Claude) - refinement.** Resolved by reviewer decision E-N.`). Citations from the original blockquote may be promoted into the rewritten prior-item answer if useful — keep the strongest 1-2 grounding refs.\n\nFor items sourced from `(new in second opinion → ...)` — gap-captured items that received a decision — rewrite the item in place inside its tail-block sub-section (`## New in Second Opinion > ### New X`), not at the top of the prior analysis. Preserve the sub-section heading and continued numbering.\n\n### General comment handling\n\nTreat `general_comment` as overarching guidance that informs the tone and direction of both document rewrites. If it contains specific actionable feedback, weave it into the relevant sections. If it is broad or general, use it as context for how the rewrites should read. Do not create a separate \"General Comment\" or \"Reviewer Notes\" section — the goal is \"final draft\" form.\n\n### Rewrite principles\n\nThe goal is a **final draft** — the documents should read as if they were written with the decisions already made. Do not mechanically append decisions. Instead, lightly rewrite affected sections so they reflect the decisions naturally. Preserve all non-affected sections unchanged. The prior-round content should still read as coherent standalone analysis after integration. Preserve the `## New in Second Opinion` tail block intact for any items that weren't decided. **Always preserve the `## Second Opinion Summary` footer verbatim** — it is the canonical record of the second round's overall position and should not be edited even when individual items it references have been resolved.\n\n## Step 8: Upload to Jira\n\nUpload both updated documents to Jira using `attachment` (operation: `\"upload\"`):\n\n1. Upload clarifying questions:\n - `ticket_number`: `{ticket_key}`\n - `file_path`: `{docs_dir}/clarifying-questions/{ticket_key}-clarifying-questions.md`\n - `link_type`: `clarifying-questions.md`\n\n2. Upload ticket quality critique:\n - `ticket_number`: `{ticket_key}`\n - `file_path`: `{docs_dir}/ticket-critiques/{ticket_key}-ticket-quality-critique.md`\n - `link_type`: `ticket-quality-critique.md`\n\n## Step 9: Complete\n\nConfirm: \"Review decisions captured and uploaded to {ticket_key}.\"\n\n## Return\n\nConfirm \"Review decisions captured and uploaded to {ticket_key}.\" and list the two attachments uploaded (`{ticket_key}-clarifying-questions.md` and `{ticket_key}-ticket-quality-critique.md`). Note any decisions that could not be applied.\n",
691
686
  "clarify-open-nfrs.md": "Proactively clarify any open non-functional requirements with the user via an interactive decision page before decomposing the epic. Clear goals and a clear desired end-state make the functional decomposition far more accurate, so resolve the unclear NFRs first.\n\n## Inputs\n\n- The framing written by the previous step: `{docs_dir}/epic-plans/{epic_slug}/goals-and-nfrs.md`.\n\n## Instructions\n\n1. Read `{docs_dir}/epic-plans/{epic_slug}/goals-and-nfrs.md`. Collect the NFRs marked `open` and note the business goal, desired end-state, and system behavior.\n\n2. **If there are no `open` NFRs**, skip the decision page entirely. Note that no clarification was needed and proceed (return). Do not generate a page just to fill it.\n\n3. **If there is at least one `open` NFR**, build the inputs for an interactive planning decision page:\n - `system_goals` (read-only): `business_goal`, `desired_end_state`, `system_behavior`, and `nfrs` — the full classified NFR list, each with `category`, `requirement`, `implication`, and `status`.\n - `actionable_items`: one card per `open` NFR. Each card has:\n - `id`: a short stable id, e.g. `NFR-1`, `NFR-2`.\n - `question`: the decision the open NFR poses (e.g. \"What latency budget must the harvester meet?\").\n - `options`: 2–4 concrete option labels. Do **not** include \"None of these\" or \"Ask about this\" — the renderer auto-appends both. If there is one obvious answer, still provide the strongest alternative as a second option.\n - `option_consequences`: one consequence line per option, parallel to and the same length as `options`.\n - `why_it_matters`: the concrete impact of the decision.\n - `recommendation_explanation`: why the recommended option is best.\n - `recommendation_index`: the 0-based index of the recommended option.\n\n4. **Call `generate_decision_page`** with `ticket_key`, `artifact_type`, routing fields, and `labels` at the root, and `system_goals` + `actionable_items` nested under `content`:\n - `artifact_type`: `pre_ticket_planning`.\n - `ticket_key`: `{epic_slug}`.\n - `output_subdir`: `epic-plans/{epic_slug}`.\n - `output_filename`: `{epic_slug}-nfr-decisions.html`.\n - `labels`: planning-flavored overrides, e.g. `title` = \"Epic Planning Decisions\", `section_heading` = \"Open Non-Functional Requirements\", and an `intro` that frames the page as settling the goals and NFRs before decomposition.\n - `content`: an object containing `system_goals` and `actionable_items` from step 3. (Omit `implementation_order` — the order is produced after decomposition.)\n\n ```typescript\n interface NfrPlanningContent {\n system_goals?: {\n business_goal: string;\n desired_end_state: string;\n system_behavior: string;\n nfrs?: Array<{\n category: string; // e.g. \"security/privacy\", \"performance/latency\"\n requirement: string;\n implication: string; // required — what this changes about the implementation\n status: \"confirmed\" | \"assumed\" | \"open\";\n }>;\n };\n actionable_items?: Array<{\n id: string; // e.g. \"NFR-1\", \"NFR-2\"\n question: string;\n why_it_matters: string;\n recommendation_explanation: string;\n options: string[]; // 2-4 option labels\n option_consequences: string[]; // same length as options\n recommendation_index: number;\n }>;\n }\n ```\n\n Example call:\n ```json\n {\n \"ticket_key\": \"{epic_slug}\",\n \"artifact_type\": \"pre_ticket_planning\",\n \"output_subdir\": \"epic-plans/{epic_slug}\",\n \"output_filename\": \"{epic_slug}-nfr-decisions.html\",\n \"labels\": { \"title\": \"Epic Planning Decisions\", \"section_heading\": \"Open Non-Functional Requirements\" },\n \"content\": {\n \"system_goals\": {\n \"business_goal\": \"Reduce MCP token tax to improve agent context efficiency.\",\n \"desired_end_state\": \"Core profile uses fewer than 15k tokens per session.\",\n \"system_behavior\": \"On-demand contract delivery with no schema round-trips.\",\n \"nfrs\": [\n { \"category\": \"performance/latency\", \"requirement\": \"No latency regression\", \"implication\": \"Validate in handler, not at boundary\", \"status\": \"confirmed\" },\n { \"category\": \"security/privacy\", \"requirement\": \"Errors never leak into HTML\", \"implication\": \"Use JSON envelope only\", \"status\": \"confirmed\" }\n ]\n },\n \"actionable_items\": [\n {\n \"id\": \"NFR-1\",\n \"question\": \"What latency budget must the harvester meet?\",\n \"why_it_matters\": \"Sets the retry window for downstream consumers.\",\n \"recommendation_explanation\": \"Under 30s matches existing SLA.\",\n \"options\": [\"Under 30s\", \"Under 60s\"],\n \"option_consequences\": [\"Tight but achievable.\", \"Relaxed, may delay alerts.\"],\n \"recommendation_index\": 0\n }\n ]\n }\n }\n ```\n\n5. **Capture the user's choices (stop and wait).** Direct the user to the returned `file_path`, tell them to open it and submit. Treat a paste as a commit only when it is a JSON object with all three top-level fields: `ticket_key` (string), `decisions` (object), and `general_comment` (string). For any item where `choice === \"ask\"`, discuss until the user gives an explicit decision before finalizing. You MUST stop and wait for the user to respond — do NOT assume answers and do NOT proceed until the open NFRs are resolved or the user explicitly declines.\n\n6. **Fold the answers back into the framing.** Rewrite `{docs_dir}/epic-plans/{epic_slug}/goals-and-nfrs.md` so each resolved NFR's `status` moves from `open` to `confirmed` (or `assumed` when the user chose a provisional default), recording the chosen resolution in the `requirement`/`implication`. Weave `general_comment` in as overarching guidance. Leave settled sections unchanged.\n\nThis step is non-blocking only insofar as the user may explicitly decline; if `generate_decision_page` fails, log a warning, direct the user to the markdown framing instead, and continue.\n\n## Return\n\nReport whether a planning decision page was generated (and its path) or skipped because there were no open NFRs, and how many open NFRs were resolved into `confirmed`/`assumed`.\n",
692
687
  "commit-and-push.md": "Stage, commit, and push implementation changes for ticket {ticket_key}.\n\nBefore executing, assess the git state and present a clear plan for user approval.\n\n## Step 1 — Assess Git State\n\nRun these commands and note the results:\n- `git branch --show-current` — record the current branch name\n- `git status --porcelain` — identify all modified, added, and untracked files\n\n## Step 2 — Determine Branch\n\nDecide the branching strategy and be prepared to state it explicitly. Cover:\n\n- Whether you will commit on the current branch, or create a new branch.\n- If creating a new branch: the exact new branch name, and which branch it will be created from (current branch vs. `main`).\n- If branching from `main`: whether `main` needs to be pulled/updated first, and the command you will run.\n- Whether the target branch already exists remotely (and if so, whether you will push to the existing remote branch).\n\nDefault rules:\n\n- If the current branch already contains `{ticket_key}` (case-insensitive), plan to commit on the current branch.\n- Otherwise, plan to create a new branch named `feature/{ticket_key}` from the current branch.\n\n## Step 3 — Prepare Commit Details\n\n- Separate implementation files from unrelated changes. Only stage files related to the ticket.\n- Compose a commit message: `{ticket_key}: <brief description of what was implemented>`\n\n## Step 4 — Present Plan for Approval (commit, push, and PR)\n\nFor this run, `auto_approve` = `{auto_approve}`.\n\n**Auto-approve mode.** If `auto_approve` is `true`, do NOT present the approval plan and do NOT wait for user input. Apply the default branching rule from Step 2 (commit on the current branch if it contains `{ticket_key}` case-insensitively; otherwise create `feature/{ticket_key}` from the current branch). Stage all files reported by `git status --porcelain` that you assess as related to the ticket per Step 3's \"Only stage files related to the ticket\" rule (when uncertain, prefer including over excluding — auto-approve trades caution for momentum, and the user has explicitly opted in). Use the commit-message format from Step 3. Skip directly to Step 5 and execute.\n\nOtherwise (any value of `auto_approve` other than the literal `true` — including empty, `false`, or missing), proceed with the existing approval flow below.\n\nPresent a single approval plan covering the commit, push, and pull request creation before proceeding:\n\n```\nCommit Plan for {ticket_key}\n─────────────────────────────\nCurrent branch: <current branch name>\nBranching: - <\"Commit on current branch\" | \"Create new branch `<name>` from `<source branch>`\">\n - <if branching from main: \"Pull latest main first via `git checkout main && git pull`\" | omit if N/A>\n - <\"Remote branch already exists — will push to existing\" | \"New remote branch — will push with -u\" | omit if N/A>\nFiles to stage: <count> files\n - path/to/file1.py\n - path/to/file2.py\nExcluded: <any unrelated changed files, or \"None\">\nCommit message: {ticket_key}: <description>\nPush to: origin/<target branch>\nPR title: <commit subject — derived automatically after commit>\nPR base: main\n```\n\nWait for the user to approve, request changes, or reject. The user may adjust the branch name, file inclusion, commit message, PR title, PR base, or give other instructions. The PR title defaults to the commit subject after the commit is made, and the PR base defaults to `main`.\n\nDo not proceed until the user explicitly approves.\n\n## Step 5 — Execute\n\n1. If creating a new branch, run `git checkout -b <branch name>`.\n2. Stage approved files with `git add <file1> <file2> ...` — do not use `git add -A` or `git add .`.\n3. Commit with the approved message.\n4. Push with `git push -u origin <branch>`.\n\n## Return\n\nConfirm the commit was made and pushed by reporting the branch name, the commit subject line, and the pushed remote (e.g. `origin/feature/{ticket_key}`). Note any files that were intentionally excluded from the commit.\n",
688
+ "comp-analysis.md": "Perceive any attached/referenced design comp with your OWN vision and map it to the existing codebase BEFORE the `jira-ticket-writer` drafts. This is the pre-writer perception step: the orchestrating recipe agent (already a frontier vision model) opens the comp, classifies it against the shared fidelity taxonomy, researches the code, and writes a structured comp→codebase map the writer consumes. The writer stays text-only and never opens images — it only reads the map you produce here.\n\nThis step is gated and backend-safe. It runs the perception with the ORCHESTRATING agent's own vision — a local image via the Read tool, or an already-attached Jira comp fetched as raw bytes via the BAPI-562 binary-safe `attachment` download (operation `download`) into a worktree `file_path`. It does NOT call `describe_image()`, does NOT depend on `src/python/llms/vision.py`, and does NOT require the `CHEAP_MODEL` vision path or any vision-model upgrade or procurement. The heavy visual reasoning is done for free by the agent that already runs the recipe.\n\n## Inputs\n\n- Run manifest: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/run-manifest.json` (source of truth for `idea`, `scope`, `readiness`). Read whichever prior artifacts exist under `{docs_dir}/idea-to-ticket/{slug}-{run_id}/` (research pack, resolved uncertainties, goals-and-nfrs, standards checklist) and proceed without the ones that do not.\n- Output artifact (this step writes it): `{docs_dir}/idea-to-ticket/{slug}-{run_id}/comp-analysis.json` — the structured comp→codebase map the drafting step reads.\n\n## Instructions\n\n1. **Gate first — evaluate only text/material metadata, never open an image yet.** Proceed to any image work ONLY when BOTH conditions hold:\n - a design comp is **referenced or attached** (a local image path in the idea/materials, or an already-attached Jira comp with an `attachment_id`), AND\n - the requested work is **design/UI work** (a frontend/fullstack change with a visual surface).\n\n This gate is deliberately conservative. A **backend-only** request, a **no-comp** request, or a **non-design** request fails the gate.\n\n2. **Not-applicable branch (gate fails) — short-circuit immediately.** When either gate condition is not met, write `comp-analysis.json` with `applicable: false`, a short `reason`, and the `gate` evidence fields, then **return immediately** — do NOT open any image, do NOT download any attachment, do NOT inject any fidelity/comp/visual language, and add no measurable latency. A backend-only or no-comp authoring input must be byte-for-byte unaffected downstream. Concretely, the not-applicable artifact is:\n\n ```json\n { \"applicable\": false, \"reason\": \"backend-only work; no design comp referenced\", \"gate\": { \"comp_referenced\": false, \"design_ui_work\": false }, \"warnings\": [] }\n ```\n\n3. **Applicable branch — obtain and OPEN the comp with your own vision.** When the gate passes:\n - **Local image path** → open it directly with the Read tool.\n - **Already-attached Jira comp** → fetch it as raw bytes using the BAPI-562 binary-safe `attachment` capability with operation `download`, passing the comp's `attachment_id` and a worktree `file_path`; the download saves the PNG/JPEG bytes to that `file_path` inside the project root, then open the saved file with the Read tool.\n - You are the orchestrating vision model — reason over the actual pixels yourself. Do NOT call `describe_image()`, do NOT use `src/python/llms/vision.py` / `CHEAP_MODEL`, and do NOT delegate perception to the text-only `jira-ticket-writer` subagent.\n\n4. **Degraded paths are skip-clean and warn-not-halt.** If the comp is missing, unreadable, an unsupported format, external-only (an `http(s)` URL you cannot fetch into a worktree `file_path`), or turns out not to be a usable design comp, write a valid `comp-analysis.json` with `applicable: false`, a `reason`, and a populated `warnings` array describing what failed, then return. A missing, unreadable, or non-comp image NEVER blocks downstream drafting and NEVER requires further image work after the failure.\n\n5. **Classify the opened comp using the shared fidelity taxonomy (do not fork it).** Using your own vision, classify the comp as exactly one of these four classes — the same labels the downstream final plan reviewer uses (`src/python/llms/agents/planner_agent/final_plan_review_agent.py`, `_get_runtime_verification_instructions`), so authoring, planning, and implementation all agree:\n - `full comp`\n - `wireframe`\n - `annotated-screenshot-of-existing-UI`\n - `unknown`\n\n Record `fidelity_classification` with a `class` (one of the four), a `confidence` value, and a short `reasoning` string.\n\n6. **Apply class-appropriate mapping depth — no over-specification.** Match the per-class rules exactly:\n - **full comp** (confident) → map exact existing components, Jinja2 templates, SCSS/CSS tokens, and routes; strict/exact component + token depth is used ONLY here.\n - **wireframe** → map layout and structure only (regions, order, rough proportions, responsive behavior); defer color, type, spacing, and component polish to the repo design system, NOT to the wireframe.\n - **annotated-screenshot-of-existing-UI** → map ONLY the delta against the current UI; preserve everything outside the annotated region and do not reproduce the screenshot wholesale.\n - **unknown / low confidence** → fall back to the design-system floor rather than mapping pixels.\n\n **Hard rule:** strict/exact mapping depth is enabled ONLY for a confidently-classified full comp. Fail toward the design system, never toward reproducing an ambiguous image.\n\n7. **Research the codebase and map each region/element to concrete existing code.** Inspect the working tree (search, grep, file reads) for the existing UI implementation surfaces: reusable components, Jinja2 templates, plain CSS/SCSS tokens and design-system styles, routes, and reusable frontend patterns. Only cite files you actually inspected — do not invent file paths, component names, tokens, or routes. For each region/element of the comp, produce a `mappings[]` entry containing:\n - `region` — the comp region or element name.\n - `visual_description` — a short description of what it looks like.\n - `components` — mapped existing component file(s).\n - `templates` — mapped existing Jinja2 template(s).\n - `tokens` — style/token references (SCSS/CSS tokens or design-system styles).\n - `routes` — route reference(s) where the element lives or should wire.\n - `confidence` — confidence for this mapping.\n - `implementation_guidance` — concrete guidance (e.g. \"reuse component X\", \"extend template Y\", \"use token Z\", \"wire route R\").\n\n8. **Write the structured map to a stable schema.** Write `comp-analysis.json` at `{docs_dir}/idea-to-ticket/{slug}-{run_id}/comp-analysis.json` with these fields:\n - `applicable` — boolean; `true` only after a comp was both detected AND successfully opened.\n - `reason` — short string explaining the applicability decision.\n - `gate` — the two-condition gate evidence (`comp_referenced`, `design_ui_work`).\n - `comp` — provenance of the opened comp (source kind, path or `attachment_id`, filename, MIME type when known).\n - `fidelity_classification` — `{ class, confidence, reasoning }`, present only when `applicable` is true.\n - `mappings` — array of the per-region entries defined in step 7 (present only when `applicable` is true).\n - `design_system_floor` — the design-system fallback guidance to use for wireframe/unknown/low-confidence regions.\n - `warnings` — array of degraded-path notes (may be empty).\n - `writer_guidance` — instructions for the downstream drafting step: when `applicable` is `true`, Requirements must cite the mapped components/templates/tokens/routes as concrete implementation guidance; when `applicable` is `false` or the map is missing, the writer must ignore this artifact and mention no comp analysis, design comp, or visual-fidelity language unless the original request independently requires it.\n\n9. **Never over-write.** Write the artifact exactly once at the path above. Downstream steps (`draft-and-critique.md`) read it; do not move it.\n\n## Return\n\nConfirm the path written (`{docs_dir}/idea-to-ticket/{slug}-{run_id}/comp-analysis.json`), whether the analysis was `applicable`, the fidelity `class` when applicable, and any `warnings`.\n",
693
689
  "create-pr.md": "# Create a pull request for the just-pushed branch\n\nThe implementation has been committed and pushed. Open a PR against `main` for the current branch, with a descriptive title derived from the commit you just made.\n\n## Step 1 — Read the commit subject line\n\nRun `git log -1 --pretty=%s` to get the most recent commit subject. The implement-ticket pipeline asks the commit step to use the form `{ticket_key}: <description>`, so this line is normally already a good PR title.\n\n## Step 2 — Determine the head branch\n\nUse `git branch --show-current`. This is the head branch.\n\n## Step 2.5 — Run the file-scope guard (warn-only, before opening the PR)\n\nBefore opening or updating the PR, run the conductor file-scope guard so an\nout-of-scope diff is surfaced in the PR-creation context:\n\n```bash\nnode \"$BAPI_CONDUCTOR_CLI_FILE\" file-scope-guard\n```\n\n(or `conductor file-scope-guard` if the packaged binary is on PATH).\n\nThis guard is **warn-only and fail-open** — it **always exits 0 and never blocks\nPR creation** in v1. Behavior:\n\n- If `BAPI_CONDUCTOR_DECLARED_TOUCHED_FILES_JSON` is **absent, empty, or invalid**,\n the guard is a **no-op** — it prints nothing and you **continue** to Step 3\n normally. Do not treat a missing declaration as an error.\n- If the guard prints a warning that your branch diff touched files **outside** the\n ticket's declared touched-file set, **surface that warning in the PR-creation\n context** (include it in your summary to the user / PR notes) but **do not block**\n — proceed to open the PR. The warning is advisory: it flags a possible\n sibling-scope over-reach for human review, it does not stop the workflow.\n\n## Step 3 — Call create_pull_request and report the PR URL\n\nCall the `create_pull_request` MCP tool directly with:\n\n- `head_branch`: value from `git branch --show-current`\n- `base_branch`: `\"main\"` — unless the user supplied a different PR base at the commit step, in which case use that value instead.\n- `title`: the commit subject from Step 1 (the derived PR title) — unless the user supplied a different PR title at the commit step, in which case use that value instead.\n\nHonor any PR title / PR base overrides the user gave at the commit step's plan; the commit step advertises those fields as adjustable, so any override the user gave there must carry forward into this tool call rather than being silently replaced by the defaults above.\n\nDo not pass a `body` parameter so the project's `.github/PULL_REQUEST_TEMPLATE.md` populates the description.\n\nReport the returned `pr_url` to the user.\n\n## Return\n\nReturn the URL of the created pull request.\n",
694
690
  "decompose-epic-candidate.md": "Decompose an Epic parent draft into ordered child tickets with idempotency and per-child duplicate checks.\n\n## Inputs\n\n- Epic parent draft: `{docs_dir}/tickets/EPIC-{slug}.md`.\n- Research pack: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/research-pack.md` / `.json`.\n- Standards checklist: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/standards-checklist.json`.\n- Resolved uncertainties: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/resolved-uncertainties.md`.\n- Goals & NFR framing: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/goals-and-nfrs.md` (its System Goals/NFRs and any provisional Recommended Implementation Order should inform the child breakdown and ordering).\n- Hard cap variable `{max_children}` (string integer; default `\"10\"` when not set by the caller). The default `\"10\"` is a **hard ceiling / upper bound, not a target** child count — it caps how many children are allowed, and is **not a goal to fill**. The normal target child count is smaller (fewer, larger M/L slices); see the sizing heuristics in step 2.\n\n## Instructions\n\n1. Read the Epic parent draft, research pack, standards checklist, and resolved uncertainties. Use only this context plus optional narrow web search; do not call deep research from this step.\n\n2. Propose ordered child tickets that, together, fully implement the Epic.\n\n **Sizing heuristics (maintainer-owned defaults).** Size each proposed child by its expected **file-touch breadth and depth plus rough lines of code (LOC) changed**, using these exact thresholds:\n - `S = 1–2 files / <~80 LOC`\n - `M = ~3–8 files / ~80–400 LOC (ideal target)`\n - `L = ~8–15 files / ~400–900 LOC (acceptable)`\n - `XL = >15 files / >~900 LOC → split further; never emit an XL child`\n\n Target size priority: `M (ideal) → L (acceptable) → S (only if unavoidable); never XL`.\n\n Bias the decomposition toward **fewer, larger, independently implementable vertical slices** rather than many tiny one-feature children. The Bridge implementation tooling works better on M–L vertical slices, and a swarm of tiny S children magnifies sibling merge risk under parallel execution. Each child should be an independently implementable vertical slice; if a proposed child would be XL, split it further until each piece is M or L.\n\n Each proposed child must include:\n - `summary` — Jira title.\n - `issue_type` — typically `Task`; use `Spike` only for primarily discovery children.\n - `rationale` — short explanation of why this child exists and what it produces. Include a brief size estimate inside this existing field (do **not** add a new `size` field), e.g. `Estimated size: M (~4 files / ~150 LOC)`.\n - `labels` — must include `ai-generated`, `idea-to-ticket`, `idea-to-ticket-child`, and the unique child idempotency label `bapi-idea-to-ticket-{run_id}-child-<N>` where `<N>` is the 1-based child index in the final ordered list.\n - `idempotency_label` — the same `bapi-idea-to-ticket-{run_id}-child-<N>` string.\n - `draft_path` — `{docs_dir}/tickets/TICKET-{slug}-child-<N>.md` (drafts written by `jira-ticket-writer` later).\n - `depends_on` — array of the 1-based child indexes that are **hard prerequisites** (must land first), or empty. Keep this list minimal and real.\n - `recommended_after` — array of child indexes that are **soft sequencing** preferences (nicer to do after, but not blockers), or empty.\n - `order_rationale` — one line explaining why this child sits at this point in the order.\n\n Keep hard prerequisites (`depends_on`) strictly separate from soft sequencing (`recommended_after`). These fields drive the recommended implementation order posted to the epic later; they do **not** create Jira dependency links.\n\n3. Hard cap enforcement. First attempt a normal, smaller M/L-biased decomposition per the step 2 sizing heuristics. Then count proposed children: `{max_children}` is a hard ceiling that **halts on exceed**, not a target to fill. If the count exceeds `{max_children}` (parsed as an integer), halt locally with a clear \"split first\" message: ask the user to split the idea into multiple smaller Epics or to raise `--max-children` deliberately. Do not silently truncate.\n\n4. Per-child duplicate lookup. For each proposed child (in order), call `get_tickets` once with a title/keyword search built from the child's summary. If a clear duplicate exists, drop that child from the plan and record the drop reason; never halt the whole run because a child has a duplicate. Re-number `<N>` only after all drops are finalized so child indexes are contiguous.\n\n5. Per-child research is restricted to the parent research pack plus optional narrow web search. Do not call deep research per child.\n\n6. Write `{docs_dir}/idea-to-ticket/{slug}-{run_id}/decomposition-plan.json` with at minimum:\n - `parent_summary` — copy from the parent draft.\n - `max_children` — the resolved integer value used for the cap.\n - `children` — ordered array of surviving children with all fields from step 2 (including `depends_on`, `recommended_after`, and `order_rationale`). After re-numbering in step 4, fix up the `depends_on`/`recommended_after` indexes so they still point at the correct surviving children.\n - `dropped_children` — array of `{proposed_summary, reason}` for children removed by duplicate lookup.\n\n## Return\n\nConfirm `decomposition-plan.json` was written, report the final child count and the number of children dropped for duplicate reasons.\n",
695
691
  "decompose-epic.md": "Decompose the epic into manageable sub-tasks and get user approval.\n\n## Epic Description\n\n{epic_description}\n\n## Instructions\n\n1. Read the following artifacts to establish full context. If a file does not exist or is empty, proceed without it:\n - `{docs_dir}/epic-plans/{epic_slug}/research-findings.md`\n - `{docs_dir}/epic-plans/{epic_slug}/codebase-exploration.md`\n\n2. Reason about the epic and produce a decomposition. Consider:\n - Logical groupings of work that can be implemented and tested independently\n - Dependencies between sub-tasks (what must be built first)\n - A reasonable scope for each sub-task (each should be achievable in a single implementation session)\n\n3. Write the decomposition to `{docs_dir}/epic-plans/{epic_slug}/epic-plan.md` with this format:\n\n```markdown\n# Epic Decomposition\n\n## Sub-tasks\n\n### 1. {Sub-task title}\n- **Scope**: {What this sub-task covers}\n- **Key files/areas**: {Files and code areas involved}\n- **Dependencies**: {Other sub-task numbers this depends on, or \"None\"}\n\n### 2. {Sub-task title}\n...\n```\n\n In addition, you MUST also write a structured JSON sidecar at\n `{docs_dir}/epic-plans/{epic_slug}/epic-plan.dag.json`.\n This file is the machine-readable intermediate consumed by the `plan-epic`\n pipeline to store and approve the plan in the backend — it must be written\n from your structured decomposition data, NEVER by re-parsing the markdown.\n\n The sidecar format is:\n\n```json\n{\n \"plan_version\": 1,\n \"nodes\": [\n {\n \"ticket_key\": \"BAPI-XXX\",\n \"status\": \"planned\",\n \"depends_on\": [],\n \"automations\": [\n { \"kind\": \"start-tickets\" }\n ]\n }\n ],\n \"edges\": [\n { \"from\": \"BAPI-XXX\", \"to\": \"BAPI-YYY\" }\n ]\n}\n```\n\n Rules for the sidecar:\n - `plan_version` must be 1 for a new plan (an integer, never a float).\n - Each node `ticket_key` must match the Jira key of the created sub-task\n (populated after Jira ticket creation in a later pipeline step; use the\n planned Jira key if known, or a placeholder like \"TBD-1\" if not yet created).\n - `ticket_key` values must be unique and non-empty after trimming.\n - `depends_on` lists the `ticket_key` values this node depends on (mirrors\n the markdown Dependencies field).\n - `status` must be `\"planned\"` for newly-created sub-tasks.\n - `automations` lists automation kinds to run on the ticket — valid values\n are `\"start-tickets\"` and `\"review-tickets\"`. Use an empty array if none.\n - `edges` is an explicit list of directed dependency edges (from → to).\n It may be empty if all dependencies are captured in `depends_on`.\n - The DAG must be acyclic (no circular dependencies).\n - The deterministic Jira-dependency-link DAG builder is the documented\n fallback/recovery path if this sidecar is lost or corrupted (not built here).\n\n4. **Soft limit check**: If the decomposition results in more than 8 sub-tasks, you must verbally warn the user: \"This decomposition has N sub-tasks, which exceeds the recommended limit of 8. Consider splitting this feature into multiple epics.\" Then proceed with the approval flow.\n\n5. Present the decomposition to the user and ask for their feedback. Explain the reasoning behind the breakdown and the dependency ordering.\n\n6. You MUST stop and wait for the user to respond. Do NOT assume approval. Do NOT proceed to the next step.\n\n7. If the user provides feedback or rejects the decomposition:\n - Incorporate their feedback\n - Rewrite `{docs_dir}/epic-plans/{epic_slug}/epic-plan.md` with the revised version\n - Present the revised decomposition and ask for approval again\n - Repeat until the user explicitly approves\n\n8. Only after explicit user approval, confirm: \"Decomposition approved. Proceeding to sub-task exploration.\"\n\n## Return\n\nConfirm \"Decomposition approved.\" and report the final sub-task count plus the path to `{docs_dir}/epic-plans/{epic_slug}/epic-plan.md`. Flag if the count exceeded the recommended limit of 8.\n",
696
- "draft-and-critique.md": "Draft the ticket(s) for this idea, run a BAPI-320 hygiene pass, and emit structured draft metadata.\n\n## Inputs\n\n- Run manifest: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/run-manifest.json`.\n- Research pack: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/research-pack.md` / `.json`.\n- Duplicate assessment: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/duplicate-assessment.json`.\n- Standards checklist: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/standards-checklist.json`.\n- Resolved uncertainties: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/resolved-uncertainties.md`.\n- Goals & NFR framing: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/goals-and-nfrs.md`.\n\n## Instructions\n\n1. Read all six input artifacts in full before drafting. The manifest's `scope` (`task`, `spike`, or `epic_candidate`) determines the drafting path.\n\n The goals-and-nfrs.md framing must shape every draft. Lead each draft with the **business goal** and **desired end-state**, and include an explicit **Non-Functional Requirements** section (and, where it clarifies behavior, the required **system behavior**). For the **epic_candidate** parent, these belong in the Epic description itself (the parent's `slim_description` should at least name the business goal + end-state, and the attached full draft must carry the Goals / Desired End-State / Non-Functional Requirements sections). Any NFR still marked `open` in the framing must be written into the draft as an explicit assumption plus an open-risk note — never silently dropped. This flow is documentary: do not generate a decision page and do not pause for clarification here.\n\n2. Drafting path by scope:\n - **task** or **spike**:\n - Call the `jira-ticket-writer` sub-agent with an explicit output path of `{docs_dir}/tickets/TICKET-{slug}.md`. The sub-agent must write the full markdown draft to that exact file.\n - **epic_candidate**:\n - Call `jira-ticket-writer` to draft only the Epic parent. Use the explicit output path `{docs_dir}/tickets/EPIC-{slug}.md`. Child tickets are produced later by `decompose-epic-candidate.md`; do not draft them here.\n\n3. Issue type policy:\n - Default ambiguous ideas to `Task`.\n - Choose `Spike` only when the work is primarily discovery/research/learning with no clear acceptance criteria yet.\n - The Epic parent uses Jira issue type `Epic`.\n\n4. Hygiene pass (BAPI-320 forbidden tokens). After the sub-agent writes the draft, read it back and ensure none of these tokens are present:\n - markdown tables (any `|`-separated header row).\n - escaped pipe-table patterns (e.g. `\\|`).\n - task-list checkboxes such as `- [ ]` or `- [x]`.\n - angle-bracket placeholder tokens (any `<placeholder>` form, even inside backticks).\n - raw HTML blocks (`<div>`, `<br>`, `<table>`, etc.).\n When a forbidden token is found, rewrite the surrounding paragraph in plain prose or bullet form and save the cleaned draft over the same path.\n\n5. Write `{docs_dir}/idea-to-ticket/{slug}-{run_id}/draft-metadata.json` describing what Jira should later create.\n\n For **task** / **spike** scope, the metadata shape is:\n - `summary` — Jira ticket title.\n - `issue_type` — `Task` or `Spike`.\n - `labels` — array of Jira labels. Must include `ai-generated`, `idea-to-ticket`, the per-run label `bapi-idea-to-ticket-{run_id}`, and the stable idea-hash label `bapi-idea-hash-{idea_hash}` (so a future run of the same idea is caught by label).\n - `idempotency_label` — `bapi-idea-to-ticket-{run_id}` (matches the label used by the duplicate-and-context-scan step).\n - `slim_description` — short Jira-safe description (no forbidden tokens). The full draft is uploaded as an attachment. It must include a CONCISE, high-level summary of the draft's `## Materials & Access` inventory (which materials are gatherable vs. record-only), noting that the exhaustive list lives in the attached full draft. This keeps the missing-materials record visible to human reviewers and to description-reading review/critique flows.\n - `attachment_path` — `{docs_dir}/tickets/TICKET-{slug}.md` (or the equivalent path used above).\n\n For **epic_candidate** scope, the metadata shape is:\n - `parent.summary` — Epic title.\n - `parent.issue_type` — `Epic`.\n - `parent.labels` — must include `ai-generated`, `idea-to-ticket`, `bapi-idea-to-ticket-{run_id}-parent`, and the stable idea-hash label `bapi-idea-hash-{idea_hash}`.\n - `parent.idempotency_label` — `bapi-idea-to-ticket-{run_id}-parent`.\n - `parent.slim_description` — short Epic description. It must include a CONCISE, high-level summary of the Epic draft's `## Materials & Access` inventory (gatherable vs. record-only), noting that the exhaustive list lives in the attached full draft.\n - `parent.attachment_path` — `{docs_dir}/tickets/EPIC-{slug}.md`.\n - `children` — placeholder array. Populated later by `decompose-epic-candidate.md`; leave as an empty array here.\n\n6. Save the metadata exactly once. Downstream steps read this file; do not move it.\n\n## Return\n\nConfirm the draft path, the metadata path, and the chosen scope (`task`, `spike`, or `epic_candidate`).\n",
692
+ "draft-and-critique.md": "Draft the ticket(s) for this idea, run a BAPI-320 hygiene pass, and emit structured draft metadata.\n\n## Inputs\n\n- Run manifest: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/run-manifest.json`.\n- Research pack: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/research-pack.md` / `.json`.\n- Duplicate assessment: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/duplicate-assessment.json`.\n- Standards checklist: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/standards-checklist.json`.\n- Resolved uncertainties: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/resolved-uncertainties.md`.\n- Goals & NFR framing: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/goals-and-nfrs.md`.\n- Comp→codebase map (optional): `{docs_dir}/idea-to-ticket/{slug}-{run_id}/comp-analysis.json`. Produced upstream by the gated `comp-analysis.md` perception step. A missing, unreadable, or `applicable: false` map is treated exactly like `applicable: false` — a no-op: it never halts drafting and this step injects no visual-fidelity/comp language on its own.\n\n## Instructions\n\n1. Read the six required input artifacts in full before drafting, plus the comp-analysis map when it is present. The manifest's `scope` (`task`, `spike`, or `epic_candidate`) determines the drafting path.\n\n The goals-and-nfrs.md framing must shape every draft. Lead each draft with the **business goal** and **desired end-state**, and include an explicit **Non-Functional Requirements** section (and, where it clarifies behavior, the required **system behavior**). For the **epic_candidate** parent, these belong in the Epic description itself (the parent's `slim_description` should at least name the business goal + end-state, and the attached full draft must carry the Goals / Desired End-State / Non-Functional Requirements sections). Any NFR still marked `open` in the framing must be written into the draft as an explicit assumption plus an open-risk note — never silently dropped. This flow is documentary: do not generate a decision page and do not pause for clarification here.\n\n2. Drafting path by scope:\n - **task** or **spike**:\n - Call the `jira-ticket-writer` sub-agent with an explicit output path of `{docs_dir}/tickets/TICKET-{slug}.md`. The sub-agent must write the full markdown draft to that exact file. Pass the comp-analysis map path (`{docs_dir}/idea-to-ticket/{slug}-{run_id}/comp-analysis.json`) into the sub-agent prompt alongside the six existing input artifacts (run manifest, research pack, duplicate assessment, standards checklist, resolved uncertainties, goals-and-nfrs).\n - **epic_candidate**:\n - Call `jira-ticket-writer` to draft only the Epic parent. Use the explicit output path `{docs_dir}/tickets/EPIC-{slug}.md`. Pass the same comp-analysis map path into the sub-agent prompt alongside the six existing input artifacts. Child tickets are produced later by `decompose-epic-candidate.md`; do not draft them here.\n\n Comp-analysis map consumption (both paths): when `comp-analysis.json` has `applicable: true`, tell the writer its Requirements MUST use the mapped components/templates/tokens/routes as concrete implementation guidance (e.g. \"reuse component X\", \"use token Z\", \"extend template Y\", \"wire route R\"). When the map has `applicable: false` or is missing/unreadable, tell the writer to ignore the artifact entirely and avoid mentioning comp analysis, design comps, or visual fidelity unless the original request independently requires those materials. This step only feeds the text JSON map to the writer — it never opens images, calls `describe_image()`, or performs vision analysis itself.\n\n3. Issue type policy:\n - Default ambiguous ideas to `Task`.\n - Choose `Spike` only when the work is primarily discovery/research/learning with no clear acceptance criteria yet.\n - The Epic parent uses Jira issue type `Epic`.\n\n4. Hygiene pass (BAPI-320 forbidden tokens). After the sub-agent writes the draft, read it back and ensure none of these tokens are present:\n - markdown tables (any `|`-separated header row).\n - escaped pipe-table patterns (e.g. `\\|`).\n - task-list checkboxes such as `- [ ]` or `- [x]`.\n - angle-bracket placeholder tokens (any `<placeholder>` form, even inside backticks).\n - raw HTML blocks (`<div>`, `<br>`, `<table>`, etc.).\n When a forbidden token is found, rewrite the surrounding paragraph in plain prose or bullet form and save the cleaned draft over the same path.\n\n5. Write `{docs_dir}/idea-to-ticket/{slug}-{run_id}/draft-metadata.json` describing what Jira should later create.\n\n For **task** / **spike** scope, the metadata shape is:\n - `summary` — Jira ticket title.\n - `issue_type` — `Task` or `Spike`.\n - `labels` — array of Jira labels. Must include `ai-generated`, `idea-to-ticket`, the per-run label `bapi-idea-to-ticket-{run_id}`, and the stable idea-hash label `bapi-idea-hash-{idea_hash}` (so a future run of the same idea is caught by label).\n - `idempotency_label` — `bapi-idea-to-ticket-{run_id}` (matches the label used by the duplicate-and-context-scan step).\n - `slim_description` — short Jira-safe description (no forbidden tokens). The full draft is uploaded as an attachment. It must include a CONCISE, high-level summary of the draft's `## Materials & Access` inventory (which materials are gatherable vs. record-only), noting that the exhaustive list lives in the attached full draft. This keeps the missing-materials record visible to human reviewers and to description-reading review/critique flows.\n - `attachment_path` — `{docs_dir}/tickets/TICKET-{slug}.md` (or the equivalent path used above).\n\n For **epic_candidate** scope, the metadata shape is:\n - `parent.summary` — Epic title.\n - `parent.issue_type` — `Epic`.\n - `parent.labels` — must include `ai-generated`, `idea-to-ticket`, `bapi-idea-to-ticket-{run_id}-parent`, and the stable idea-hash label `bapi-idea-hash-{idea_hash}`.\n - `parent.idempotency_label` — `bapi-idea-to-ticket-{run_id}-parent`.\n - `parent.slim_description` — short Epic description. It must include a CONCISE, high-level summary of the Epic draft's `## Materials & Access` inventory (gatherable vs. record-only), noting that the exhaustive list lives in the attached full draft.\n - `parent.attachment_path` — `{docs_dir}/tickets/EPIC-{slug}.md`.\n - `children` — placeholder array. Populated later by `decompose-epic-candidate.md`; leave as an empty array here.\n\n6. Save the metadata exactly once. Downstream steps read this file; do not move it.\n\n## Return\n\nConfirm the draft path, the metadata path, and the chosen scope (`task`, `spike`, or `epic_candidate`).\n",
697
693
  "duplicate-and-context-scan.md": "Detect existing Jira tickets that duplicate or relate to this idea before any Jira mutation.\n\n## Inputs\n\n- Run manifest: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/run-manifest.json`.\n- Research pack: `{docs_dir}/idea-to-ticket/{slug}-{run_id}/research-pack.md` (if produced).\n- Pipeline variable `allow_duplicate` controls override behavior (for this run, `allow_duplicate` = `{allow_duplicate}`). Treat the literal string `\"true\"` as override; any other value (including `\"false\"`, missing, or empty) is non-override.\n\n## Instructions\n\n> **Orchestrator-directed step.** This agent task is part of the full-automation chain and is authorized to call `get_tickets` as directed below — performing an orchestrator-directed tool call is not \"re-orchestrating\".\n\n1. Build at least two Jira search queries from the manifest:\n - **Title/keyword query**: use the most salient nouns from `idea` and `slug` as title/text keywords. Prefer 2-4 concrete terms over long natural-language sentences. Run via `get_tickets`.\n - **Stable idea-hash query** (the reliable cross-run dedup): run `get_tickets` with its `labels` parameter set to `bapi-idea-hash-{idea_hash}`. This label is identical for every run of the same idea, so it catches a PRIOR run that already created a ticket for this idea — even one created days ago. A hit here is a strong `duplicate` signal.\n - **Idempotency-label query**: run `get_tickets` with its `labels` parameter set to `bapi-idea-to-ticket-{run_id}` (the tool builds the `labels in (...)` JQL for you — do not pass a raw JQL string). This per-run label only matches a partial run of THIS same run, so it supports resume behavior.\n\n2. For each returned ticket, capture: ticket key, summary, status, and a short reason it matched (which query, which keyword).\n\n3. Classify the overall verdict as one of:\n - `duplicate` — at least one returned ticket clearly describes the same work as `idea`.\n - `related` — returned tickets are adjacent or partial overlaps but not the same work.\n - `none_found` — no meaningful matches.\n - `unable_to_check` — the Jira search itself failed (network error, auth error, JQL rejection). Record the failure and pick this verdict.\n\n4. Write `{docs_dir}/idea-to-ticket/{slug}-{run_id}/duplicate-assessment.json` with at minimum:\n - `verdict` — one of the four values above.\n - `matches` — array of `{ticket_key, summary, status, reason}` objects (may be empty).\n - `queries_used` — array of the actual JQL/search strings sent.\n - `allow_duplicate` — the resolved value of `{allow_duplicate}` for this run.\n\n5. Halt behavior:\n - If `verdict` is `duplicate` and `allow_duplicate` is not `\"true\"`, halt locally. Do not continue the pipeline. Tell the user that the duplicate halt is strict and that re-running with `--allow-duplicate` overrides it.\n - If `verdict` is `duplicate` and `allow_duplicate` is `\"true\"`, continue the pipeline but keep the duplicate evidence in the assessment file so downstream steps can reference it (e.g., to add a \"supersedes\" note to the draft).\n - For `related`, `none_found`, and `unable_to_check`, continue without halting.\n\n## Return\n\nConfirm `duplicate-assessment.json` was written, report `verdict`, and report whether the run is halting or continuing.\n",
698
694
  "evaluate-and-recommend.md": "Evaluate the clarifying questions and ticket critiques generated for {ticket_key} against the actual codebase, then decorate every actionable item with the resolution guidance the reviewer will need on the decision page. The result is a single combined review-and-resolution document.\n\n## Phase 0 — Grounding & Audit Setup\n\nBefore gathering any source documents, extract the codebase-grounding context produced by the preceding `materialize_fresh_base` pipeline step:\n\n- Read the `materialize_fresh_base` tool result from earlier in this session. It returns JSON `{ base_sha, base_branch, fresh_base_root }` — or, when `no_refresh_base` was set, `{ base_sha: \"local-stale\", fresh_base_root: <original repo root> }`.\n- Retain `fresh_base_root` and `base_sha` for the rest of this procedure. Every codebase read in Phase 1 / Phase 2 below is grounded against `fresh_base_root`. `fresh_base_root` is also the exact value you must pass to the pipeline's later `cleanup_fresh_base` step — it is a *runtime* value returned by the tool call, not a static recipe variable, so pass the real path string you captured here, not any placeholder text shown in the step's params.\n- If the `materialize_fresh_base` step's result contains an `error` field and `no_refresh_base` was NOT set, this is the fail-loud condition the recipe's `on_error: \"halt\"` exists for: stop here, do not fall back to grounding against your own working directory, and report the failure (name the attempted base branch and the remediation — retry, or rerun with `--no-refresh-base`).\n\n**Metadata Audit Header** — the very first content of the generated review-and-resolution document, before any other section, must be:\n\n```\n**Base SHA**: <base_sha>\n**Base Branch**: <base_branch, or \"(local, in-place)\" when base_sha is \"local-stale\">\n**Grounding Status**: <Freshly Materialized | Stale/In-Place Fallback>\n```\n\n- `Grounding Status` is **Freshly Materialized** whenever `base_sha` is a real commit SHA (the normal path).\n- `Grounding Status` is **Stale/In-Place Fallback** whenever `base_sha` is exactly `local-stale` (the `--no-refresh-base` opt-out path). In this case, immediately follow the header with a prominent, bold, high-contrast warning block, for example:\n\n > **⚠ STALE GROUNDING — `--no-refresh-base` was used.** This review evaluated the codebase as checked out locally, NOT a freshly-fetched `origin/<base>`. `file:line` citations may reflect uncommitted or unmerged local state.\n\n**Codebase grounding rule**: Ground ALL file reads and codebase searches exclusively against the `fresh_base_root` directory extracted above. Do NOT read codebase files from your default working directory or session cwd — `fresh_base_root` is the only trustworthy source of truth for `file:line` citations in this procedure.\n\n**Original-repo rule**: Ticket docs, `{docs_dir}` inputs, and ALL output paths stay in the ORIGINAL repository, never the `fresh_base_root` temp dir. This includes the ticket-fetch call below, the clarifying-questions / critique source documents, and the saved review-and-resolution output file (see the Save rule at the bottom). Do NOT redirect any of these into `fresh_base_root`.\n\n**Path hygiene rule**: Every `file:line` citation and Codebase Evidence entry in the output document MUST be repo-relative — strip the `fresh_base_root` absolute-path prefix before writing it down. A citation must never contain a temp-dir / `/tmp/...`-style absolute path (write `src/foo.ts:10`, never `/tmp/bridge-review-.../src/foo.ts:10`).\n\n1. Fetch the current ticket description using the `get_ticket` tool with ticket_number `{ticket_key}` exactly once at the top of this procedure.\n\n2. Gather the clarifying questions and critique documents from the preceding pipeline steps. The local files at `{docs_dir}/clarifying-questions/{ticket_key}-clarifying-questions.md` and `{docs_dir}/ticket-critiques/{ticket_key}-ticket-quality-critique.md` are the canonical source. After a second-opinion run, each document has this shape:\n\n - A top-level H1 (`# Ticket Analysis` for clarifier docs, `# Ticket Quality Critique` for critique docs) followed by an italic provider-attribution line of the form `_This analysis was generated by GPT|Claude|Gemini._`. The attribution names the LLM family that produced the **first round**.\n - The first-round questions / critique items, exactly as written by the first-round model.\n - **Inline second-opinion blockquotes** nested directly under each prior item the second round addressed. Each blockquote starts with `> **Second opinion (<provider>) - <stance>.**` where `<provider>` is `GPT|Claude|Gemini` and `<stance>` is `concurrence|refinement|disagreement`. The blockquote is followed by `> *Citations: <comma-separated grounding refs>*`. Items the second round did **not** comment on have no blockquote — that is the \"weak concurrence\" signal. Use the provider name in the blockquote header to attribute the comment to the second-round LLM family in your evaluation prose where helpful.\n - A **`## New in Second Opinion`** tail block listing items the second round added on top of the first round. Immediately under the H2 you will find a second italic attribution line of the form `_These additional points were raised by GPT|Claude|Gemini._` — this names the second-round LLM family. Sub-headings are agent-specific:\n - Clarifier docs: `### New Requirements Questions` and `### New Technical Questions` — numbering continues from the prior section.\n - Critique docs: `### New Requested Changes` and `### New Points to Consider` — numbering continues from the prior section.\n Each new item has its own `*Citations: ...*` line.\n - A final **`## Second Opinion Summary`** footer (1-3 sentences) capturing the second round's overall position. This always renders, even when the second round had no inline comments and no new items.\n\n **Legacy fallback shape**: in rare cases (model lacks JSON-schema support, the JSON call failed, or the response could not be parsed), the document may instead end with `\\n\\n---\\n\\n` followed by a `## Second Opinion` section containing `### Response to Prior Items` and `### Additional Points` subsections. If you detect this fallback shape, treat it equivalently: subsection responses tagged `concurrence` map to weak/strong concurrence (use the body length to disambiguate — bare one-line concurrences are weak), `refinement`/`disagreement` map to the disagree buckets, and items under `### Additional Points` map to the gap-captured bucket below.\n\n **Partial-source-doc tolerance**: if the clarifying-questions doc OR the ticket-critique doc is missing or unreadable, skip that document silently and produce items only for the surviving doc. Do not fail. If **both** documents are absent, still write the combined output file at `{docs_dir}/review/{ticket_key}-review-and-resolution.md` with the standard top-level sections (`Confirmed Improvements`, `Needs Scrutiny`, `Open Questions`, `Round Agreement Summary`) present but no emitted E-items in any section. This preserves downstream file-existence expectations for the capture-review-decisions step.\n\n3. Determine **Round Agreement** for every clarifying question and critique point using these rules:\n\n - **Both rounds agree (weak concurrence)** — the prior item has NO inline blockquote AND is not in `## New in Second Opinion`. The second round did not object to the point and did not consider it important enough to comment on. Briefly validate the answer's groundedness against the codebase. If validation surfaces concerns, demote this item to **rounds disagree** (single round only depth) and treat as Needs Scrutiny.\n - **Both rounds agree (strong concurrence)** — the prior item carries an inline `> **Second opinion (<provider>) - concurrence.** ...` blockquote. The second round explicitly reinforced the prior point. Reuse the blockquote's `*Citations:*` as starting evidence; verify briefly.\n - **Rounds disagree (refinement)** — the prior item carries an inline `> **Second opinion (<provider>) - refinement.** ...` blockquote. The second round modified or added detail. Apply full disagreement-depth analysis; reuse blockquote citations.\n - **Rounds disagree (disagreement)** — the prior item carries an inline `> **Second opinion (<provider>) - disagreement.** ...` blockquote. The second round contradicts the prior. Apply full disagreement-depth analysis; categorize the outcome based on which position the codebase supports.\n - **Gap captured** — the item lives under `## New in Second Opinion > ### New <category>` (one of: New Requirements Questions, New Technical Questions, New Requested Changes, New Points to Consider). Apply the two-axis check below. Reuse the new item's `*Citations:*` as starting evidence.\n - **Single round only** — the document has none of the above markers (no inline blockquotes, no `## New in Second Opinion` block, no `## Second Opinion Summary` footer). The pipeline ran only one round. Treat every item as a disagreement: cite 2+ codebase locations and give full analytical depth.\n\n Apply these depth and categorization rules:\n\n - **Both rounds agree (weak concurrence)**: 1 codebase citation, 1-2 sentence assessment confirming grounding. Categorize as Confirmed Improvement if grounded; demote to Needs Scrutiny if validation finds problems.\n - **Both rounds agree (strong concurrence)**: 1 codebase citation (may reuse a blockquote citation), 1-2 sentence assessment. Categorize as Confirmed Improvement.\n - **Rounds disagree (refinement or disagreement)**: 2+ codebase citations, 3-4 sentence assessment that explicitly weighs the prior-round position against the second-opinion position. Categorize based on which position the evidence supports. Always include both positions in the Assessment.\n - **Gap captured — two-axis check** (for items in `## New in Second Opinion`):\n - If both the question is grounded in the codebase/standards AND the best-guess answer is sensible → **Confirmed Improvement** with a 1-2 sentence assessment and 1 citation.\n - If the question is genuine but the best-guess answer is flawed → **Needs Scrutiny**. Cite 2+ files. Use disagreement-depth.\n - If the question itself does not hold up → **Needs Scrutiny** with evidence of what the code actually does. Disagreement-depth.\n - If neither codebase nor standards can settle the question → **Open Questions**. Disagreement-depth.\n - **Single round only**: Treat as a disagreement — cite 2+ codebase locations and give full analytical depth.\n\n For critique points (Requested Changes and Points to Consider), apply the same Round Agreement rules. The signal locations are inline `> **Second opinion (<provider>) - ...**` blockquotes nested under items in `### Requested Changes` / `### Points to Consider`, and gap-captured items under `## New in Second Opinion > ### New Requested Changes` / `### New Points to Consider`.\n\n **Depth calibration**:\n - When Round Agreement is `both rounds agree (weak concurrence)`, `both rounds agree (strong concurrence)`, or `gap captured` (passes both axes), keep Assessment to 1-2 sentences and Codebase Evidence to 1 citation — the validation step or the consensus does the heavy lifting.\n - When Round Agreement is `rounds disagree (refinement)`, `rounds disagree (disagreement)`, or `single round only`, Assessment should be 3-4 sentences and Codebase Evidence should cite 2+ files explaining the discrepancy.\n - A `gap captured` item that FAILS the two-axis check uses the disagreement depth, not the gap-captured depth.\n - A `weak concurrence` item that FAILS your validation gets demoted: change Round Agreement to `rounds disagree (single round only)`, expand Assessment to 3-4 sentences, and add a 2nd citation.\n\n **Source field conventions** — the `**Source**` string disambiguates where in the source doc the item lives so the downstream `capture-review-decisions` step can route the rewrite correctly. Use these forms:\n\n - **Weak concurrence (silent prior item)**: `Clarifying Q3 (prior round, weak concurrence)` or `Critique: Requested Change 2 (prior round, weak concurrence)`.\n - **Strong concurrence (explicit blockquote)**: `Clarifying Q9 (prior round, concurrence inline)` or `Critique: Points to Consider 1 (prior round, concurrence inline)`.\n - **Refinement (inline blockquote)**: `Clarifying Q3 (prior round, refinement inline)`.\n - **Disagreement (inline blockquote)**: `Clarifying Q5 (prior round, disagreement inline)`.\n - **Gap captured (tail-block item)**: `Clarifying Q11 (new in second opinion → New Requirements Questions)` or `Critique: Requested Change N+1 (new in second opinion → New Requested Changes)`. Always spell out the sub-section name after the arrow — capture-review-decisions uses it to find the rewrite target.\n - **Single round only**: `Clarifying Q3 (single round)`.\n\n## Phase 1 — Evaluate and classify every item\n\nNumber every item sequentially across all sections (E-1, E-2, E-3, …). When the same underlying issue is raised in BOTH the clarifying-questions doc and the critique doc, consolidate it into a SINGLE E-item rather than emitting one per source, and cite both origins in its `**Source**` field (e.g. `Clarifying Q3 + Critique: Requested Change 2`); keep the numbering sequential with no gaps. Classify every clarifying question and every critique point into exactly one of three buckets using the Round Agreement rules, codebase groundedness checks, and the `gap captured` two-axis check before producing any recommendation decoration:\n\n- **Confirmed Improvements**: Suggestions that are grounded and would genuinely improve the ticket by closing significant gaps or correcting design issues. Includes weak-concurrence items that passed validation, strong-concurrence items, and `gap captured` items that passed both axes.\n- **Needs Scrutiny**: Suggestions based on inaccurate codebase assumptions, with evidence of the actual code behavior. Includes `gap captured` items that failed either axis, weak-concurrence items demoted by validation, and the loser of any rounds-disagree pair.\n- **Open Questions**: Legitimate ambiguities that require human input to resolve.\n\nPhase 1 must complete before Phase 2 begins — do not start decorating an item with a decision tree, recommendation index, or clarity fields until classification is final.\n\n## Phase 2 — Decorate actionable items with resolution guidance\n\nPhase 2 applies **only** to items in the `Needs Scrutiny` and `Open Questions` buckets. Confirmed Improvements remain compact and undecorated (see \"Confirmed Improvements output\" below).\n\nFor every actionable (Needs Scrutiny / Open Questions) item, produce the following template using these stable labels:\n\n```\n### E-<sequential number>: <concise title>\n\n**Source**: <where this item lives in the source doc — see Source field conventions above>\n\n**Round Agreement**: <one of the six values> — <1 sentence on what the second round contributed>\n\n**Confidence**: <High|Medium|Low>\n\n**Resolution path**: <\"resolve at your desk\" or \"needs a conversation\">\n\n**Decision tree**:\n- If <condition 1>, then <action 1>. See `file:line`. <1-2 sentence rationale.>\n- If <condition 2>, then <action 2>. See `file:line`. <1-2 sentence rationale.>\n- If <condition 3>, then <action 3>. See `file:line`. <1-2 sentence rationale.>\n\n**Recommendation Index**: <0-based index of the recommended branch in the decision tree above>\n\n**Recommendation**: <which branch the evidence best supports and why, 1-2 sentences>\n\n**Original question**: <the clarifying-question or critique point as it was originally raised, sourced verbatim or near-verbatim from the original clarifying-questions / critique docs. Light rephrasing is allowed; do NOT introduce new technical content. Soft cap ~30 words.>\n\n**Option consequences**:\n- <consequence for branch 1 — describe the behavioral consequence of choosing this option, not its rationale. ~25 words.>\n- <consequence for branch 2 — same shape. ~25 words.>\n- <consequence for branch 3 — same shape. ~25 words.>\n\n**Why it matters**: <one concrete sentence on the impact this decision has on the ticket, the users, or the affected code paths. Soft cap ~40 words.>\n\n**Recommendation explanation**: <explain why the recommended branch is the best choice, tied to the codebase evidence and the consequences of each option. Soft cap ~60 words.>\n\n**Assessment**: <three-point structure>\n1. **State the original suggestion**: What did the clarifying question or critique point propose?\n2. **State the codebase evidence**: What does the actual code show about this suggestion?\n3. **State the implication**: Does the evidence confirm the suggestion, contradict it, or leave it unresolved?\n\n**Codebase Evidence**:\n- `path/to/file.ts:42` — <what this line/block demonstrates>\n- `path/to/other.ts:110-125` — <what this range demonstrates>\n\n<If no direct codebase evidence exists, state: \"No direct codebase evidence found.\">\n```\n\n**Writing quality**: Write each Assessment as if explaining to a colleague who has NOT read the original clarifying questions or critique documents. Each assessment should be self-contained and understandable without cross-referencing the source material. The three-point Assessment structure ensures every assessment tells a complete story rather than assuming the reader already knows what was suggested and why.\n\n**Decision tree rules**:\n- Each decision tree must have **2–4 branches**. Do not exceed 4 and do not produce only 1.\n- **Strict lower bound — reclassify on single-branch items**: If you can think of only one branch for a `Needs Scrutiny` or `Open Questions` item — that is, the resolution is effectively forced — you must reclassify the item as a **Confirmed Improvement** instead of emitting a single-branch decision tree. The 2-branch lower bound is a hard rule; do not work around it by stretching to a contrived second branch. If a single answer is genuinely the only path, the item belongs in Confirmed Improvements.\n- Each branch must end with a concrete, actionable step (not \"investigate further\").\n- Cite relevant code in `file:line` format where possible. If no code reference exists, omit the citation rather than fabricating one.\n- Cap each branch at 2-3 sentences total (including the action and rationale).\n- `**Recommendation Index**` must be the 0-based index of the recommended branch in the decision tree above. The first branch is index 0, the second is index 1, etc.\n- **Option consequences** must be a list parallel to the decision-tree branches: one entry per branch, in the same order. Describe the behavioral consequence of choosing that option, not its rationale.\n- **\"resolve at your desk\"**: The item can be resolved through technical investigation — reading code, running tests, or checking configuration. No stakeholder input needed.\n- **\"needs a conversation\"**: The item involves a product decision, scope question, or cross-team dependency that cannot be resolved from the codebase alone.\n\n**Confidence Tags** — assign confidence based on codebase evidence strength:\n- **High**: Cite specific `file:line` references that directly support the assessment.\n- **Medium**: Reference related code patterns or architectural conventions, but not the exact code in question.\n- **Low**: No direct codebase evidence. Assessment is based on general reasoning or domain knowledge.\n\n### Confirmed Improvements output\n\nRender each Confirmed Improvement as a single bullet in a compact list. No headings per item, no decision trees, no clarity-field decoration:\n\n- **E-<number>: <title>** — Source: <source string>; Round Agreement: <one of the six values>; Confidence: <High|Medium|Low>. <recommended action, 1 sentence.>\n\nThe compact bullet still includes `Source`, `Round Agreement`, `Confidence`, and the one-sentence recommended action so `capture-review-decisions.md` can map these items to its `clear_improvements` array.\n\n## Round Agreement Summary\n\nAfter all items are processed, produce a summary section that groups items by round agreement status:\n\n### Points of Disagreement\nFor items where the evaluation marked `rounds disagree (refinement)`, `rounds disagree (disagreement)`, or `single round only` — including `gap captured` items that failed the two-axis check and landed in Needs Scrutiny — list as bullets with the E-number, the nature of the disagreement, and a 1-sentence explanation of why this disagreement matters for the ticket (e.g., it indicates an architectural ambiguity, a scope question, or a standards gap).\n\nIf no items were marked as disagreements, write: \"All reviewed points had round consensus. No disagreement-driven risks identified.\"\n\n### Points of Agreement\nSplit this section into two sub-bullets to surface the difference between the second round explicitly reinforcing a point versus tacitly accepting it:\n\n**Strong agreement** — items where the evaluation marked `both rounds agree (strong concurrence)`. The second round took the trouble to write an explicit `concurrence` blockquote; this is a soft signal that the point is important enough that the second round wanted to underline it. List as bullets with the E-number and a half-sentence noting the shared conclusion.\n\n**Weak agreement** — items where the evaluation marked `both rounds agree (weak concurrence)`. The second round did not object and did not consider the item important enough to comment on; the local agent's brief validation found no concerns. List as bullets with the E-number and a half-sentence noting the conclusion. Lower priority for human review than strong-agreement items.\n\nIf a sub-bullet has no items, omit it (rather than writing a \"no items\" note for each — keep the section tidy).\n\n### Gaps Captured by Second Round\nFor items where the evaluation marked `gap captured` (sound second-opinion Additional Points confirmed as Confirmed Improvements): list as bullets with the E-number and a half-sentence noting the gap the second round surfaced. These items did not require a decision — they are already in Confirmed Improvements — but are surfaced here so the reviewer sees what the second-round analysis added on top of the first round.\n\nIf no gaps were captured, write: \"The second round did not surface any net-new confirmed improvements.\"\n\n## Edge Cases\n\n- If the evaluation contains zero items in Needs Scrutiny, write: \"No items flagged for scrutiny. All reviewed suggestions were either confirmed or remain open questions.\"\n- If the evaluation contains zero items in Open Questions, write: \"No open questions identified. All ambiguities were resolved through codebase analysis.\"\n- If both Needs Scrutiny and Open Questions are empty, include only the Confirmed Improvements section and add a summary: \"All suggestions from the review were confirmed as grounded improvements. No decision trees are needed.\"\n- If both source documents are absent, still write the combined file with the standard top-level sections present but no emitted E-items rather than failing.\n\n## Example of a Well-Written E-Item (Weak Concurrence — Confirmed Improvement)\n\n### E-2: Caching of analysis-type lookups\n\n**Source**: Clarifying Q4 (prior round, weak concurrence)\n\n**Round Agreement**: both rounds agree (weak concurrence) — the second round did not comment on this item; brief validation confirms the answer is grounded.\n\n**Assessment**: The prior round suggested caching `ANALYSIS_TYPES` lookups in a module-level variable to avoid repeated DB round trips. The codebase already does this at `src/python/learn_repository/__init__.py:14`, so the suggestion is grounded and the second round's silence is consistent with tacit agreement.\n\n**Codebase Evidence**:\n- `src/python/learn_repository/__init__.py:14` — module-level constant pattern is the established convention\n\n(Confirmed Improvements compact bullet form: **E-2: Caching of analysis-type lookups** — Source: Clarifying Q4 (prior round, weak concurrence); Round Agreement: both rounds agree (weak concurrence); Confidence: High. Confirm the existing module-level cache and add a short comment naming the pattern.)\n\n## Example of a Well-Written E-Item (Strong Concurrence — Confirmed Improvement)\n\n### E-4: Sequential per-type review_repository fan-out\n\n**Source**: Clarifying Technical Q2 (prior round, concurrence inline)\n\n**Round Agreement**: both rounds agree (strong concurrence) — the second round explicitly reinforced the prior recommendation, citing per-type lock release simplicity as the deciding factor.\n\n**Assessment**: The prior round recommended sequential per-type execution; the second-opinion blockquote reinforced this, noting that the per-type lock release contract becomes trivial under sequential execution. `review_repository` already uses internal `asyncio.gather` for chunk-level concurrency, so wrapping it in another concurrency layer would not buy throughput and would complicate the abort/finally cleanup contract.\n\n**Codebase Evidence**:\n- `src/python/learn_repository/review_repository.py:369-387` — review_repository internally gathers chunks with return_exceptions=True\n\n## Example of a Well-Written E-Item (Rounds Disagree — Needs Scrutiny with full clarity fields)\n\n### E-5: Authentication middleware placement for new endpoint\n\n**Source**: Clarifying Q2 (prior round, disagreement inline)\n\n**Round Agreement**: rounds disagree (disagreement) — the prior round recommended adding auth at the router level; the second-opinion blockquote argued the existing middleware stack already covers it.\n\n**Confidence**: High\n\n**Resolution path**: resolve at your desk\n\n**Decision tree**:\n- If the global middleware stack already enforces auth on `/api/*` routes, then drop the explicit `Depends(require_api_key)` from the new endpoint. See `main.py:45-52`.\n- If routers each opt in to auth via dependencies, then add `Depends(require_api_key)` to the new endpoint. See `api/routes/__init__.py:18-30`.\n- If only certain `/api/*` sub-paths need auth, then carve out a sub-router with its own dependency. See `api/routes/__init__.py:18-30`.\n\n**Recommendation Index**: 1\n\n**Recommendation**: The existing routers each opt in to auth, so the new endpoint must do the same. Adding `Depends(require_api_key)` is the smallest correct change.\n\n**Original question**: Should the new `/api/exports` endpoint declare an explicit auth dependency, or is it covered by the global middleware?\n\n**Option consequences**:\n- Endpoint becomes publicly reachable; protected data leaks via the new path.\n- Endpoint requires a valid API key, matching every other `/api/*` route.\n- Adds a parallel router; doubles the auth surface that has to be kept consistent.\n\n**Why it matters**: Authentication on `/api/exports` directly determines whether protected data leaks; the wrong default is a security regression, not a stylistic choice.\n\n**Recommendation explanation**: The codebase pattern in `api/routes/__init__.py:18-30` shows each router declaring its own `Depends(require_api_key)`. Following that convention adds two lines, keeps auth uniform across endpoints, and avoids a parallel sub-router that future maintainers would have to keep in sync.\n\n**Assessment**: The prior round suggested that the new `/api/exports` endpoint needs an explicit `Depends(require_api_key)` guard because it is not covered by the global middleware. The second opinion disagreed, claiming the middleware stack in `main.py` handles authentication for all `/api/*` routes. Codebase analysis shows that `main.py:45-52` applies rate limiting globally but authentication is applied per-router in `api/routes/__init__.py:18-30` — each router must opt in via `Depends(require_api_key)`. This supports the prior round's position: the new endpoint needs an explicit auth dependency.\n\n**Codebase Evidence**:\n- `main.py:45-52` — global middleware applies rate limiting and CORS, but not authentication\n- `api/routes/__init__.py:18-30` — each router includes its own auth dependency; there is no catch-all auth middleware\n\n## Example of a Well-Written E-Item (Gap Captured — Confirmed Improvement)\n\n### E-7: Missing Alembic migration for new role-scope column\n\n**Source**: Critique: Requested Change N+1 (new in second opinion → New Requested Changes)\n\n**Round Agreement**: gap captured — the second opinion surfaced a missing migration that the prior round did not raise, and recommended adding an Alembic revision.\n\n**Assessment**: The ticket introduces a new `role_scope` column on the `users` table but does not mention a migration. The second opinion flagged this gap and recommended adding an Alembic revision; both the gap and the recommendation are grounded, since `db/alembic/versions/` is the established location for schema changes per the project's database guide.\n\n**Codebase Evidence**:\n- `db/alembic/versions/` — all schema changes land here as autogenerated revisions\n\n## Save rule\n\nSave the combined review-and-resolution document to `{docs_dir}/review/{ticket_key}-review-and-resolution.md`. Output only the combined review-and-resolution document — no meta-commentary.\n\n## Return\n\nConfirm \"Review-and-resolution document written to `{docs_dir}/review/{ticket_key}-review-and-resolution.md`.\" and report the total count of E-items captured.\n",
699
695
  "execute-epic-research.md": "Execute the research plan and write findings.\n\n## Instructions\n\n1. Read the research plan from `{docs_dir}/epic-plans/{epic_slug}/research-plan.md`.\n\n2. Execute the plan based on the Research Mode:\n\n **If mode is `deep`**:\n - Call the `request_deep_research` MCP tool with:\n - `query`: the Deep Research Query from the plan\n - `context`: \"Bridge API is a Python/FastAPI application with PostgreSQL, LiteLLM, and Pinecone. This research supports epic planning for: {epic_description}\"\n - `wait_for_result`: true\n - `save_locally`: true\n - If deep research fails, log a warning and fall back to web searches using the Web Search Topics from the plan. Do NOT halt.\n\n **If mode is `web`**:\n - Perform web searches for each topic listed in the plan.\n - Capture relevant findings from each search.\n\n **If mode is `none`**:\n - Write a brief note: \"No external research needed. Proceeding with codebase exploration.\"\n\n3. Write all findings to `{docs_dir}/epic-plans/{epic_slug}/research-findings.md` with this structure:\n\n```markdown\n# Research Findings\n\n## Mode\n{deep | web | none}\n\n## Findings\n{Synthesized research results organized by topic. Include source references where applicable.}\n\n## Key Takeaways\n{Bullet points summarizing the most important findings that will inform the codebase exploration and epic decomposition.}\n```\n\n## Return\n\nConfirm research findings were written to `{docs_dir}/epic-plans/{epic_slug}/research-findings.md` and report the mode used (`deep`, `web`, or `none`) plus a one-line summary of the key takeaways.\n",
@@ -702,7 +698,7 @@ export const INSTRUCTIONS = {
702
698
  "explore-epic-codebase.md": "Perform a holistic, epic-level codebase exploration.\n\n## Epic Description\n\n{epic_description}\n\n## Instructions\n\n1. Read the research findings from `{docs_dir}/epic-plans/{epic_slug}/research-findings.md` to establish context. If the file does not exist or is empty, proceed without it.\n\n2. Explore the codebase with a focus on breadth rather than depth. The goal is to build a \"lay of the land\" understanding for the entire epic, not to deeply analyze any single sub-task. Search by filename pattern, search file contents by text pattern, and read relevant files to find:\n - Files, modules, and directories relevant to the epic\n - Architectural patterns used in similar features\n - Integration points and dependencies between modules\n - Existing conventions for the type of work this epic involves\n - Database models, API routes, agent flows, and utilities that may be affected\n\n3. Build a mental model of:\n - What exists today that relates to the epic\n - What patterns and conventions are used in similar features\n - What dependencies, data flows, and integration points are involved\n - What areas of the codebase will likely need changes\n\n4. Write the exploration findings to `{docs_dir}/epic-plans/{epic_slug}/codebase-exploration.md` with this structure:\n\n```markdown\n# Codebase Exploration\n\n## Architecture Overview\n{High-level description of how the relevant parts of the codebase are structured.}\n\n## Relevant Code Areas\n{List of key files, modules, and directories with brief descriptions of their relevance to the epic.}\n\n## Existing Patterns\n{Patterns and conventions discovered that should be followed when implementing the epic.}\n\n## Integration Points\n{Dependencies, data flows, and integration points that the epic will need to account for.}\n\n## Potential Challenges\n{Any architectural constraints, technical debt, or complexity that could affect implementation.}\n```\n\n## Return\n\nConfirm the codebase exploration was written to `{docs_dir}/epic-plans/{epic_slug}/codebase-exploration.md` and return a concise summary of the discovered codebase areas, naming the key files and patterns relevant to the epic.\n",
703
699
  "explore-epic-subtasks.md": "Perform focused code explorations for each approved sub-task.\n\n## Instructions\n\n1. Read the approved decomposition from `{docs_dir}/epic-plans/{epic_slug}/epic-plan.md`.\n\n2. Create the explorations directory:\n ```\n mkdir -p {docs_dir}/epic-plans/{epic_slug}/explorations/\n ```\n\n3. For each sub-task in the decomposition, perform a focused exploration:\n - Search for specific files and patterns relevant to the sub-task\n - Identify implementation options and tradeoffs\n - Reference the holistic codebase exploration (`{docs_dir}/epic-plans/{epic_slug}/codebase-exploration.md`) and research findings (`{docs_dir}/epic-plans/{epic_slug}/research-findings.md`) for context\n - Default to lightweight exploration — only go deeper when the holistic exploration left significant gaps for a specific sub-task\n\n4. Write an exploration document for each sub-task to `{docs_dir}/epic-plans/{epic_slug}/explorations/NN-{subtask-slug}.md` (using zero-padded numbering, e.g., `01-add-pipeline-json.md`, `02-create-instruction-files.md`).\n\n5. Each exploration document MUST include these exactly named sections:\n\n```markdown\n# {Sub-task title}\n\n## Context\n{Brief description of the sub-task scope and its role within the epic.}\n\n## Relevant Code\n{Specific files, functions, and patterns relevant to this sub-task. Reference with file_path:line_number format.}\n\n## Implementation Options\n{Viable approaches for implementing the sub-task. For each option: description, pros, cons.}\n\n## Recommendation\n{Which option to pursue and why. Include any caveats or risks.}\n```\n\n6. **Word count guidance**: Target 300-500 words per document. Keep the exploration lightweight. Only exceed this limit if the holistic codebase exploration left significant gaps for a specific sub-task.\n\n## Return\n\nConfirm one exploration document was written per sub-task under `{docs_dir}/epic-plans/{epic_slug}/explorations/` and return a concise summary of the discovered code areas and recommended approaches across the sub-tasks.\n",
704
700
  "frame-goals-and-nfrs.md": "Frame the business goals, desired end-state, and non-functional requirements (NFRs) for this work before any functional decomposition or drafting. When the goals and the desired end-state of the system are clear, the functional requirements become much easier to design accurately. This step is documentary: it records the framing and classifies what is unclear. It does NOT pause and does NOT generate a decision page (interactive surfaces handle that separately).\n\n## Inputs\n\n- The idea or epic description for this run, plus any prior planning artifacts the earlier steps wrote into this run's working directory under `{docs_dir}` (for example: research findings, codebase exploration, resolved uncertainties, duplicate assessment). Read whichever of these exist; proceed without the ones that do not.\n\n## Instructions\n\n1. From the inputs, derive and state plainly:\n - **Business goal** — the business value this work delivers and why it matters.\n - **Desired end-state** — the concrete state the system should reach once this work is done.\n - **System behavior** — how the system must behave to complete its task (the quality attributes in prose, not a feature list).\n\n2. Identify the non-functional requirements. Consider every one of these canonical NFR categories and include the ones that genuinely apply (omit categories that do not):\n - security/privacy\n - performance/latency\n - reliability/failure-modes\n - observability/auditability\n - accessibility/UX\n - data-integrity/migration\n - compatibility\n - operability/config\n - compliance/SOC2\n - rollout/reversibility\n\n For each NFR you include, write three things: the `requirement`, its `implication` (what this requirement changes about the implementation), and a `status`. **An NFR with no concrete implication is boilerplate — drop it rather than record it.**\n\n3. Classify each NFR's `status` with this rubric:\n - `confirmed` — only if it is explicitly stated in the idea/description/standards or is directly observable in the codebase.\n - `assumed` — only if it is a low-risk, conventional, and reversible default.\n - `open` — if it touches architecture, the data model, security, user-visible behavior, migration, or irreversible Jira creation and is not settled. Be willing to mark things `open`: surfacing an unclear NFR is the point of this step.\n\n4. If this work is an epic (it will be decomposed into multiple sub-tasks or child tickets), draft a provisional **recommended implementation order**. For each slice, record a short title, its hard prerequisites (`depends_on` — what must land first), any soft sequencing preferences (`recommended_after` — not hard blockers), and a one-line rationale. Keep hard prerequisites separate from soft sequencing. Do not create Jira dependency links — the order is delivered into the epic downstream.\n\n5. Write the framing to a file named `goals-and-nfrs.md` in this run's working directory — the **same directory the earlier exploration/research steps in this pipeline wrote to** under `{docs_dir}`. Getting this path right matters: downstream steps read `goals-and-nfrs.md` from that exact directory and silently degrade (they see no framing) if it lands elsewhere. The directory differs by pipeline:\n - **plan-epic**: the epic plan directory, `docs/epic-plans/<epic-slug>/` (alongside `codebase-exploration.md` and `epic-plan.md`).\n - **idea-to-ticket**: the run directory, `docs/idea-to-ticket/<slug>-<run-id>/` (alongside `research-pack.md` and `resolved-uncertainties.md`).\n\n Use this structure (no markdown tables, no `- [ ]` checkboxes — BAPI-320 hygiene):\n\n```markdown\n# Goals & Non-Functional Requirements\n\n## Business Goal\n{business goal}\n\n## Desired End-State\n{desired end-state}\n\n## System Behavior\n{how the system must behave to complete its task}\n\n## Non-Functional Requirements\n- **{nfr category}** ({confirmed, assumed, or open}): {the requirement}. Implication: {what it changes about the implementation}.\n- ...\n\n## Recommended Implementation Order\n(Epics only; omit this section for a single task or spike.)\n1. {slice title} — depends on: {hard prerequisites or \"none\"}; recommended after: {soft preferences or \"none\"}. Rationale: {one line}.\n2. ...\n```\n\n## Return\n\nConfirm `goals-and-nfrs.md` was written, report the counts of `confirmed` / `assumed` / `open` NFRs, and state whether a recommended implementation order was produced (epics) or skipped (single task/spike).\n",
705
- "gather-and-attach-materials.md": "Post-create materials-completeness step. Gather the reachable local text materials a freshly-created ticket references and attach them via `attachment` (operation: `\"upload\"`), while recording everything that is record-only. This is the POST-CREATE half of the upload-time materials-completeness pass (BAPI-423); the PRE-CREATE half — inventorying and writing the `## Materials & Access` section into the draft — already ran in the `jira-ticket-writer` agent.\n\n## Inputs\n\n- `{ticket_number}` — the real Jira key of the already-created ticket (e.g. `BAPI-423`). Attachment is a POST-CREATE step; never attempt to attach before the key exists.\n- `{draft_file_path}` — path to the draft markdown that carries the trailing `## Materials & Access` section.\n- `{auto_approve_external}` — the unattended-vs-interactive signal (named for consistency with `upload-and-track.md`). **Polarity is counter-intuitive: `\"true\"` means UNATTENDED, which is the MORE restrictive mode here** — skip all prompts AND keep external/auth-gated materials record-only (never auto-attach them). It does NOT grant permission to attach external materials. Any other value (including `\"false\"`, missing, or empty) means an interactive invocation that MAY prompt for external/auth-gated materials. Invocations from `write-ticket` and `full-automation` are always unattended (`\"true\"`) for this step.\n\n## Instructions\n\n> **Orchestrator-directed step.** This agent task is authorized to call `attachment` (operations: `list`, `upload`) and `update_ticket_description` as directed below.\n\n1. **Read the record.** Read `{draft_file_path}` and parse its trailing `## Materials & Access` section. Collect the inventoried items grouped under *Reachable Local Files*, *External/Auth-Gated Links*, *Design/UI Comps (Fetchable)* (when present), and *Binary/Image Materials (Record-Only)*. If there is no `## Materials & Access` section, there is nothing to gather — return a no-op success.\n\n2. **Deduplicate first.** Call the `attachment` MCP tool with `operation` set to `\"list\"` and `ticket_number` set to `{ticket_number}` BEFORE uploading anything, so a resumed or re-run invocation does not re-attach a material that is already present. Compare against the deterministic filenames computed in step 4 and skip any that already exist.\n\n3. **Source classification (scheme-based, no network probe).** Honor the classification already recorded in the draft:\n - **Reachable Local Files** (local filesystem paths) are the only **low-risk** materials eligible for auto-attach — proceed to step 4.\n - **External/Auth-Gated Links** (every `http(s)` URI, even if explicitly linked) are **record-only** on unattended paths. If `{auto_approve_external}` is `\"true\"` (or the invocation is from `write-ticket` / `full-automation`), leave them record-only and never auto-attach. (Mind the polarity: `auto_approve_external = \"true\"` means we are in unattended mode, so external materials must stay record-only — `\"true\"` is NOT permission to attach them.) Only an explicitly interactive invocation (`auto_approve_external` is any non-`\"true\"` value) may prompt the user to confirm before attaching.\n - **Binary/Image Materials** are **record-only** in this step: the `attachment` tool's `upload` operation is UTF-8 text only, so never attempt a binary upload. (Binary-upload capability is the fast-follow sibling ticket BAPI-424.)\n - **Design/UI Comps (Fetchable)** are **not uploaded by this step**. A fetchable design/UI comp is a reference (an `attachment_id` or path) to a comp that already lives on the Jira ticket (or is fetched at implementation time); this gather step neither re-uploads it nor UTF-8-encodes its bytes. Leave each such comp reference recorded with its `attachment_id`/path in the `## Materials & Access` record so a later implementation agent can download it into its worktree via the Jira attachment download capability.\n\n4. **Gather and size-tier each reachable local text material.** For each low-risk local text material:\n - Read the local file from disk.\n - If the content exceeds **200,000 characters**, SKIP the upload and RECORD it (note the path and that it was skipped for size) — do not attach it.\n - If the content is **<= 200,000 characters**, upload it RAW via `attachment` (operation: `\"upload\"`). Do NOT summarize locally: the backend already summarizes attached text at plan time, so the size tiers are backend behavior this step defers to. The agent performs NO local summarization.\n - Use a deterministic, sanitized filename of the form `{ticket_number}-material-{hash}.md` (using the `{ticket_number}` input from the Inputs section), where `{hash}` is the first 8 hex characters of the SHA-256 digest of the sanitized absolute source path. Pin this algorithm exactly (SHA-256, first 8 hex chars, of the sanitized absolute path) — do NOT substitute another hash — so the same source always maps to the same filename and the dedup in step 2 works across separate sessions and re-runs. Keep the sanitized source provenance inside the attachment body, not only in the filename.\n\n5. **`attachment` upload parameter discipline (Zod).** When calling `attachment` with `operation: \"upload\"`, pass `ticket_number`, the attachment filename, and the text content. OMIT the optional parameters `link_type` and `replace_existing` entirely when they are unused — do NOT pass `null` or empty strings for them. The Zod schemas reject `null`/empty values, so an unused optional parameter must be omitted rather than nulled.\n\n6. **Redact secrets everywhere.** Before writing any URL or access note ANYWHERE — the Jira `## Materials & Access` record, any warning or final-report output, and any local intermediate file — sanitize and redact embedded credentials, SAS tokens, API keys, and basic-auth secrets using a high-visibility placeholder such as `[REDACTED_TOKEN]`. Mirror the backend `_redact_forge_fields()` / `_sanitize_jira_error_message()` patterns. A location/access note must never expose a plaintext secret.\n\n7. **Warn, never halt (error handling).** This step must NEVER halt, prompt-to-fail, or fail the overarching command because a material could not be gathered or attached. Follow the warn-not-halt convention:\n - If an `attachment` upload call fails (or a file disappeared between inventory and upload), warn gracefully and continue with the next material.\n - On such a post-create attach failure, call `update_ticket_description` to record the failure in the issue's `## Materials & Access` record (the material became unavailable only after the issue existed). `update_ticket_description` is an existing MCP tool, not a backend change.\n - Everything knowable PRE-CREATE was already written into the description at create time, so `update_ticket_description` is reserved for these rarer post-create attach failures. This complements the existing `partial_success` recording convention in `upload-and-track.md`.\n - Apply the step 6 redaction to every warning and recorded note.\n\n## Return\n\nConfirm the outcome: which local materials were attached (with their deterministic filenames), which were skipped/recorded (over-size, external/auth-gated, or binary/image), any attach failures recorded via `update_ticket_description`, and that no failure halted the run.\n",
701
+ "gather-and-attach-materials.md": "Post-create materials-completeness step. Gather the reachable local text materials and eligible local design/UI comp images a freshly-created ticket references and attach them via `attachment` (operation: `\"upload\"`), while recording everything that is record-only. This is the POST-CREATE half of the upload-time materials-completeness pass (BAPI-423); the PRE-CREATE half — inventorying and writing the `## Materials & Access` section into the draft — already ran in the `jira-ticket-writer` agent.\n\n## Inputs\n\n- `{ticket_number}` — the real Jira key of the already-created ticket (e.g. `BAPI-423`). Attachment is a POST-CREATE step; never attempt to attach before the key exists.\n- `{draft_file_path}` — path to the draft markdown that carries the trailing `## Materials & Access` section.\n- `{auto_approve_external}` — the unattended-vs-interactive signal (named for consistency with `upload-and-track.md`). **Polarity is counter-intuitive: `\"true\"` means UNATTENDED, which is the MORE restrictive mode here** — skip all prompts AND keep external/auth-gated materials record-only (never auto-attach them). It does NOT grant permission to attach external materials. Any other value (including `\"false\"`, missing, or empty) means an interactive invocation that MAY prompt for external/auth-gated materials. Invocations from `write-ticket` and `full-automation` are always unattended (`\"true\"`) for this step.\n\n## Instructions\n\n> **Orchestrator-directed step.** This agent task is authorized to call `attachment` (operations: `list`, `upload`) and `update_ticket_description` as directed below.\n\n1. **Read the record.** Read `{draft_file_path}` and parse its trailing `## Materials & Access` section. Collect the inventoried items grouped under *Reachable Local Files*, *External/Auth-Gated Links*, *Design/UI Comps (Fetchable)* (when present), and *Binary/Image Materials (Record-Only)*. If there is no `## Materials & Access` section, there is nothing to gather — return a no-op success.\n\n2. **Deduplicate first.** Call the `attachment` MCP tool with `operation` set to `\"list\"` and `ticket_number` set to `{ticket_number}` BEFORE uploading anything, so a resumed or re-run invocation does not re-attach a material that is already present. Compare against the deterministic filenames computed in step 4 (for both text materials and design comp image uploads) and skip any that already exist.\n\n3. **Source classification (scheme-based, no network probe).** Honor the classification already recorded in the draft:\n - **Reachable Local Files** (local filesystem paths that are **NOT tracked in version control**) are **low-risk** materials eligible for auto-attach — proceed to step 4. The pre-create inventory already excluded version-controlled files (source code and in-repo docs are already available in the repository and are never attached — they are cited inline as *Relevant code*). As a safety net, this step must **never attach a file that is available in version control**: if any item listed under *Reachable Local Files* is a code file or otherwise clearly version-controlled, skip it and treat it as record-only.\n - **External/Auth-Gated Links** (every `http(s)` URI, even if explicitly linked) are **record-only** on unattended paths. If `{auto_approve_external}` is `\"true\"` (or the invocation is from `write-ticket` / `full-automation`), leave them record-only and never auto-attach. (Mind the polarity: `auto_approve_external = \"true\"` means we are in unattended mode, so external materials must stay record-only — `\"true\"` is NOT permission to attach them.) Only an explicitly interactive invocation (`auto_approve_external` is any non-`\"true\"` value) may prompt the user to confirm before attaching.\n - **Binary/Image Materials (Record-Only)** ordinary/unrelated binaries (arbitrary screenshots, PDFs, ZIPs, and other binaries not design-relevant) stay **record-only** in this step; never attempt to upload them.\n - **Design/UI Comps (Fetchable)** split by whether the comp is a *local* file or a reference to something already remote:\n - A **local design/UI comp image** (a reachable local file whose extension maps to an allowlisted image MIME type — `image/png`, `image/jpeg`, `image/webp`, `image/gif`) is eligible for auto-attach via the (now allowlist-guarded) binary upload path — proceed to step 4.\n - A **non-local design reference** a Jira `attachment_id` reference on another ticket, or an external/auth-gated design link — is **not** uploaded by this step; it is a reference to a comp that already lives on Jira (or is fetched at implementation time). This gather step neither re-uploads it nor re-encodes its bytes. Leave each such reference recorded with its `attachment_id`/path in the `## Materials & Access` record so a later implementation agent can download it into its worktree via the Jira attachment download capability.\n\n4. **Gather and size-tier each reachable local text material; compute deterministic filenames for local design comp images.**\n - For each low-risk local **text** material:\n - Read the local file from disk.\n - If the content exceeds **200,000 characters**, SKIP the upload and RECORD it (note the path and that it was skipped for size) — do not attach it.\n - If the content is **<= 200,000 characters**, upload it RAW via `attachment` (operation: `\"upload\"`). Do NOT summarize locally: the backend already summarizes attached text at plan time, so the size tiers are backend behavior this step defers to. The agent performs NO local summarization.\n - Use a deterministic, sanitized filename of the form `{ticket_number}-material-{hash}.md` (using the `{ticket_number}` input from the Inputs section), where `{hash}` is the first 8 hex characters of the SHA-256 digest of the sanitized absolute source path.\n - For each eligible local **design/UI comp image** identified in step 3:\n - Use a deterministic filename of the form `{ticket_number}-material-{hash}{ext}`, where `{hash}` is computed the same way (first 8 hex characters of the SHA-256 digest of the sanitized absolute source path) and `{ext}` is the lowercased allowlisted source extension (`.png`, `.jpg`, `.jpeg`, `.webp`, `.gif`).\n - Pin the hash algorithm exactly (SHA-256, first 8 hex chars, of the sanitized absolute path) — do NOT substitute another hash — so the same source always maps to the same filename and the dedup in step 2 works across separate sessions and re-runs. Compute comp filenames before the step 2 dedup comparison is applied. Keep the sanitized source provenance inside the text attachment body (not applicable to binary comp uploads), not only in the filename.\n\n5. **`attachment` upload parameter discipline (Zod).**\n - For text materials, call `attachment` with `operation: \"upload\"`, `ticket_number`, the deterministic attachment filename, and the text `content`.\n - For design comp image uploads, call `attachment` with `operation: \"upload\"`, `ticket_number`, `file_path` (the local source path), and `file_name` set to the deterministic comp filename from step 4 — pass `file_path` rather than reading and UTF-8-encoding the bytes yourself, so `resolveUploadAttachment()` performs binary detection, the MIME allowlist check, and base64 encoding. Never UTF-8-encode image bytes locally.\n - In both cases, OMIT the optional parameters `link_type` and `replace_existing` entirely when they are unused — do NOT pass `null` or empty strings for them. The Zod schemas reject `null`/empty values, so an unused optional parameter must be omitted rather than nulled.\n\n6. **Redact secrets everywhere.** Before writing any URL or access note ANYWHERE — the Jira `## Materials & Access` record, any warning or final-report output, and any local intermediate file — sanitize and redact embedded credentials, SAS tokens, API keys, and basic-auth secrets using a high-visibility placeholder such as `[REDACTED_TOKEN]`. Mirror the backend `_redact_forge_fields()` / `_sanitize_jira_error_message()` patterns. A location/access note must never expose a plaintext secret.\n\n7. **Warn, never halt (error handling).** This step must NEVER halt, prompt-to-fail, or fail the overarching command because a material could not be gathered or attached. Follow the warn-not-halt convention:\n - If an `attachment` upload call fails (or a file disappeared between inventory and upload), warn gracefully and continue with the next material.\n - This includes design comp image uploads: an unsupported/disallowed MIME type, an oversize image (`> 10 MB`), a missing local file, a malformed upload payload, or a Jira upload failure must all be warned and skipped, never halting the run.\n - On such a post-create attach failure, call `update_ticket_description` to record the failure in the issue's `## Materials & Access` record (the material became unavailable only after the issue existed). `update_ticket_description` is an existing MCP tool, not a backend change.\n - Everything knowable PRE-CREATE was already written into the description at create time, so `update_ticket_description` is reserved for these rarer post-create attach failures. This complements the existing `partial_success` recording convention in `upload-and-track.md`.\n - Apply the step 6 redaction to every warning and recorded note.\n\n## Return\n\nConfirm the outcome, reporting each category separately: which local text materials were attached (with their deterministic filenames), which design/UI comp images were attached (with their deterministic filenames), which materials were skipped/recorded as record-only (over-size text, external/auth-gated links, ordinary/unrelated binaries, or non-local design references), any attach failures recorded via `update_ticket_description`, and that no failure halted the run.\n",
706
702
  "get-prd.md": "# get_prd\n\nRetrieve an already-generated **Product Requirements Document (PRD)** for a Jira\nticket.\n\nThis tool only **fetches** an existing PRD — it does **not** start or trigger\ngeneration. If no PRD exists yet (or you need a fresh one), call `request_prd`\nfirst; it starts the async generation and `get_prd` retrieves the result once\nprocessing completes.\n\nThe PRD is product/stakeholder-facing: problem framing, goals, non-goals, target\nusers, success metrics, product requirements, scope, and risks. Present the\nreturned markdown verbatim without summarizing.\n\n## Parameters\n\n| Parameter | Type | Default | Description |\n| --- | --- | --- | --- |\n| `ticket_number` | string | — | Jira ticket key in `PROJECT-NUMBER` format (e.g. `BAPI-123`). |\n| `save_locally` | boolean | `true` | Save the retrieved PRD to a local file. Set to `false` to skip saving. |\n\nLocal saves go to `BAPI_DOCS_DIR/prd/{ticket}-prd-plan.md`.\n\n## Return\n\n- The full PRD as markdown text when one exists.\n- A `404` / not-found response when no PRD is ready yet — that means generation\n has not run, not that the tool failed. Call `request_prd` to generate one.\n",
707
703
  "learn-architecture.md": "## Objective\n\nExplore the codebase to identify architectural principles, directory conventions, design patterns, and data flow, then draft `architecture_instructions` for the project config.\n\n## Instructions\n\n### Phase 1 — Principles Research\n\nResearch the codebase to identify architectural principles and conventions. For each area below, examine at least 5 representative files. Cite file paths for every pattern. Include code examples (5-15 lines) showing correct usage. Where relevant, include a WRONG example showing the common mistake.\n\nFor each pattern, classify its evidence level:\n- `ENFORCED` — consistently followed across the codebase, violations would be bugs\n- `CONVENTION` — commonly observed, occasional deviations exist\n- `ASPIRATIONAL` — intended direction, not yet consistently applied\n\nResearch areas:\n1. **Architectural coding patterns**: Search `api/routes/` and `api/library/` for separation of concerns, layer boundaries, function-vs-class decisions. Read files matching `*_lib.py`, `*_utils.py`, `*_helpers.py` to document module naming suffix conventions.\n2. **Design patterns**: Search for factory functions, strategy patterns, middleware chains, registry patterns, and dependency injection in `api/` and `src/python/`. Cite concrete usage with file path and function name.\n3. **Dependency management**: Read `requirements.in`, `requirements-dev.in`, and `package.json` files to document how dependencies are declared and organized.\n4. **Error handling architecture**: Search for `log_exception_to_sentry` and `HTTPException` usage patterns across `api/routes/` to document the system-wide error propagation strategy.\n5. **Configuration management**: Search for `os.environ` and `get_config_field` usage to document the two-tier system (env vars vs. database config).\n6. **Tech stack detection**: Read `requirements.in`, `package.json`, and `main.py` to identify primary languages, frameworks, and key libraries.\n7. **Security architecture**: Read `api/routes/setup/auth.py` and search for `require_api_key`, `require_api_session`, and `verify_repo_access` to document authentication and authorization design.\n8. **Agent prompting conventions**: Read files in `src/python/llms/agents/` to document prompt construction, section headers, dynamic content delimiters, and role-based personas.\n\nScope exclusion: Do NOT document testing patterns. Skip the `tests/` directory entirely.\n\nWrite findings to `{docs_dir}/tmp/architecture-principles.md`.\n\n### Phase 2 — Structure & Data Flow Research\n\n1. Call the `regenerate_directory_map` MCP tool to get a fresh directory map.\n2. Read the principles document from Phase 1.\n3. Research and document:\n - **Directory conventions**: For each major directory, document purpose, file naming, internal structure, and an example file.\n - **Module boundaries and import patterns**: Which directories are distinct modules and how they interact. Document import restrictions.\n - **Data flow patterns**: Trace 2-3 complete request paths (synchronous, async background task, agent orchestration).\n - **Integration patterns**: How external services (Jira, GitHub/Bitbucket, LLMs, Pinecone, PostgreSQL) are integrated.\n - **Background task patterns**: The async task lifecycle with `asyncio.create_task`, semaphores, and error reporting.\n\nWrite findings to `{docs_dir}/tmp/architecture-structure.md`.\n\n### Phase 3 — Draft\n\n1. Read both research documents.\n2. Combine into a single `architecture_instructions` draft with these required sections:\n - **1. Core Principles** — Each principle with evidence level and explanation.\n - **2. Layered Architecture** — Layer separation, dependency rule, agent vs orchestration logic.\n - **3. Directory Conventions** — Purpose, naming, structure for each major directory.\n - **4. Data Flow Patterns** — Complete request path traces with file paths.\n - **5. Technical Standards** — Coding style, async patterns, database, schema, LLM integration, config, dependencies.\n - **6. Error Handling & Monitoring** — Error propagation strategy, Sentry integration, Langfuse tracing.\n - **7. Security & Authentication** — Auth architecture, session model, permission model.\n - **8. Agent Prompting Conventions** — Prompt construction, section headers, content delimiters.\n - **9. Integration Points** — External service clients and their calling patterns.\n - **10. AI Code Generation Guidelines** — Anti-patterns, duplication avoidance, pattern compliance checklist.\n\n3. Write the draft to `{docs_dir}/standards/architecture_instructions.md`.\n\n## Return\n\nReturn a brief summary of what was learned about the project's architecture (core principles, directory conventions, data flow), citing the key files inspected, and confirm the draft was written to `{docs_dir}/standards/architecture_instructions.md`.\n",
708
704
  "learn-backend-correctness.md": "## Objective\n\nExplore the codebase to identify correctness standards for backend code, then draft the corresponding correctness standards document.\n\n## Target Type\n\n- **Type**: `backend_correctness`\n- **Field name**: `backend_correctness_standards`\n- **Scope**: Server-side code: Python, Ruby, Go, Java, C#, Node.js server code, API routes, business logic.\n\n## Instructions\n\n### Phase 1 — Explore Correctness Patterns\n\nFocus on implementation correctness: how to write code that is correct, idiomatic, and robust within this project's conventions.\n\n1. **File Type Detection**: Search by filename pattern for files matching `**/*.py` in `api/` and `src/python/`. If very few or no files exist, note this and draft minimal instructions.\n\n2. **Convention Analysis**: Read 3-5 representative files in `api/routes/` and `api/library/` to identify:\n - Structure patterns (imports, exports, class structure, function ordering)\n - Naming conventions (variables, functions, classes, files)\n - Framework conventions and idioms\n - Best practices followed\n - Issues and inconsistencies\n\n Also read files to document:\n - Error handling implementation (try/except ordering, Sentry calls) with CORRECT/WRONG examples\n - Authentication implementation (auth check sequence) with code examples\n - Database call patterns (`postgres_helpers` (bool, result) tuple handling) with CORRECT/WRONG examples\n - Input validation patterns (Pydantic models, naming conventions)\n - HTTP client patterns (error handling, JiraError sanitization)\n - Async implementation patterns (`asyncio.to_thread()` for blocking code)\n\n### Phase 2 — Draft\n\nDraft correctness standards as clear, actionable instructions for an AI code generation agent. Cover:\n- Code structure and organization requirements\n- Naming conventions to follow\n- Framework-specific patterns and idioms\n- Security requirements relevant to this code type\n- Performance considerations\n- Common mistakes to avoid\n- Guards against common AI weaknesses: duplicative code, verbose implementations, security vulnerabilities\n\nAlso include:\n- Route handler boilerplate (auth -> validation -> business logic -> error handling)\n- Database interaction patterns with CORRECT/WRONG examples\n- Exception handling pattern (specific first, HTTPException re-raise, generic with Sentry)\n- Sentry reporting patterns and common mistakes\n- Input sanitization rules (JiraError headers, raw exception messages)\n\nWrite the draft to `{docs_dir}/standards/backend_correctness_standards.md`.\n\n## Return\n\nReturn a brief summary of what was learned about backend correctness conventions (structure, naming, error handling, auth, DB patterns), citing the key files inspected, and confirm the draft was written to `{docs_dir}/standards/backend_correctness_standards.md`.\n",