This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
- package/CHANGELOG.md +160 -0
- package/README.md +69 -9
- package/agents/claude/cubit-agent.md +164 -2
- package/agents/claude/data-agent.md +163 -2
- package/agents/claude/domain-agent.md +164 -2
- package/agents/claude/feature-manager.md +361 -22
- package/agents/claude/integration-validator.md +1 -0
- package/agents/claude/po-agent.md +1 -0
- package/agents/claude/security-agent.md +163 -2
- package/agents/claude/test-agent.md +165 -2
- package/agents/claude/ui-agent.md +159 -8
- package/config/agent-coordination.json +335 -0
- package/config/independent-mode-template.md +202 -0
- package/lib/independent-agent-tracker.js +565 -0
- package/lib/setup-independent-mode.js +562 -0
- package/lib/state-manager.js +526 -0
- package/package.json +4 -2
- package/templates/enhanced-task-breakdown-template.md +415 -0
- package/templates/enhanced-task-history-template.md +605 -0
- package/templates/feature-template.md +116 -30
- package/templates/additional_cubit_req.md +0 -357
- package/templates/additional_data_req.md +0 -480
- package/templates/additional_domain_req.md +0 -431
- package/templates/additional_ui_req.md +0 -205
- package/templates/feature-history-template.md +0 -280
- package/templates/platform-adaptive-widget-template.dart +0 -407
- package/templates/pretty-ui-examples.md +0 -597
- package/templates/task-breakdown-template.md +0 -265
- package/templates/task-history-template.md +0 -276
|
@@ -0,0 +1,415 @@
|
|
|
1
|
+
---
|
|
2
|
+
feature_name: ${FEATURE_NAME}
|
|
3
|
+
status: ${STATUS:planning}
|
|
4
|
+
created_date: ${CREATED_DATE}
|
|
5
|
+
updated_date: ${UPDATED_DATE}
|
|
6
|
+
feature_file: docs/features/${FEATURE_NAME}.md
|
|
7
|
+
state_file: docs/features/${FEATURE_NAME}_state.json
|
|
8
|
+
agents_assigned: 8
|
|
9
|
+
estimated_duration: ${ESTIMATED_DURATION}
|
|
10
|
+
priority: ${PRIORITY:medium}
|
|
11
|
+
completion: ${COMPLETION_PERCENTAGE:0}%
|
|
12
|
+
current_phase: ${CURRENT_PHASE:planning}
|
|
13
|
+
parallel_execution: ${PARALLEL_EXECUTION:enabled}
|
|
14
|
+
---
|
|
15
|
+
|
|
16
|
+
# ${FEATURE_NAME} - Task Breakdown & Implementation Plan
|
|
17
|
+
|
|
18
|
+
## ๐ Executive Summary
|
|
19
|
+
**Feature**: ${FEATURE_NAME}
|
|
20
|
+
**Status**: ${STATUS:planning}
|
|
21
|
+
**Overall Progress**: ${COMPLETION_PERCENTAGE:0}% Complete
|
|
22
|
+
**Created**: ${CREATED_DATE}
|
|
23
|
+
**Current Phase**: ${CURRENT_PHASE:planning}
|
|
24
|
+
**Active Agent**: ${CURRENT_AGENT:FeatureMaster}
|
|
25
|
+
**Estimated Completion**: ${ESTIMATED_COMPLETION:TBD}
|
|
26
|
+
|
|
27
|
+
## ๐ฏ FeatureMaster Analysis
|
|
28
|
+
${FEATURE_ANALYSIS:Completed comprehensive analysis of feature requirements and technical specifications.}
|
|
29
|
+
|
|
30
|
+
### Key Findings:
|
|
31
|
+
${KEY_FINDINGS:
|
|
32
|
+
- Technical complexity assessment
|
|
33
|
+
- COPPA compliance requirements identified
|
|
34
|
+
- Performance requirements evaluated
|
|
35
|
+
- Security considerations analyzed
|
|
36
|
+
}
|
|
37
|
+
|
|
38
|
+
### Architectural Decisions:
|
|
39
|
+
${ARCHITECTURAL_DECISIONS:
|
|
40
|
+
- Clean Architecture pattern implementation
|
|
41
|
+
- State management strategy with Cubit
|
|
42
|
+
- Data layer design with repository pattern
|
|
43
|
+
- Security measures and compliance framework
|
|
44
|
+
}
|
|
45
|
+
|
|
46
|
+
### Parallel Execution Strategy:
|
|
47
|
+
${PARALLEL_STRATEGY:
|
|
48
|
+
- UI Agent + Domain Agent can work in parallel after PO Agent completion
|
|
49
|
+
- Security Agent can begin review during implementation phases
|
|
50
|
+
- Test Agent can prepare test infrastructure during development
|
|
51
|
+
- Integration Validator coordinates final system integration
|
|
52
|
+
}
|
|
53
|
+
|
|
54
|
+
## ๐ Detailed Agent Task Assignments
|
|
55
|
+
|
|
56
|
+
### ๐ PO Agent (Phoenix) - Requirements & Planning
|
|
57
|
+
**Status**: ${PO_STATUS:โณ Pending}
|
|
58
|
+
**Progress**: ${PO_PROGRESS:0}%
|
|
59
|
+
**Estimated Duration**: ${PO_DURATION:4-6 hours}
|
|
60
|
+
**Priority**: Critical
|
|
61
|
+
**Dependencies**: Feature definition completed
|
|
62
|
+
|
|
63
|
+
#### Assigned Tasks:
|
|
64
|
+
- [ ] **REQ-001**: Comprehensive requirements analysis from docs/features/${FEATURE_NAME}.md
|
|
65
|
+
- [ ] **REQ-002**: User story breakdown with detailed acceptance criteria
|
|
66
|
+
- [ ] **REQ-003**: Functional and non-functional requirements definition
|
|
67
|
+
- [ ] **REQ-004**: Stakeholder communication and approval process
|
|
68
|
+
- [ ] **REQ-005**: Technical feasibility assessment and constraint identification
|
|
69
|
+
- [ ] **REQ-006**: Risk assessment and mitigation strategy
|
|
70
|
+
- [ ] **REQ-007**: COPPA compliance requirements specification
|
|
71
|
+
|
|
72
|
+
**Quality Gates**:
|
|
73
|
+
- โ
All requirements clearly documented and validated
|
|
74
|
+
- โ
User stories meet INVEST criteria (Independent, Negotiable, Valuable, Estimable, Small, Testable)
|
|
75
|
+
- โ
Technical constraints identified and solutions proposed
|
|
76
|
+
- โ
Stakeholder approval obtained with sign-off
|
|
77
|
+
- โ
COPPA compliance requirements specified
|
|
78
|
+
|
|
79
|
+
**Deliverables**:
|
|
80
|
+
- Updated and validated feature documentation
|
|
81
|
+
- Detailed user stories with acceptance criteria
|
|
82
|
+
- Technical specification document
|
|
83
|
+
- Risk assessment and mitigation plan
|
|
84
|
+
- Stakeholder approval documentation
|
|
85
|
+
|
|
86
|
+
**Handoff to**: UI Agent + Domain Agent (parallel execution)
|
|
87
|
+
|
|
88
|
+
---
|
|
89
|
+
|
|
90
|
+
### ๐จ UI Agent (Aria) - Presentation Layer Implementation
|
|
91
|
+
**Status**: ${UI_STATUS:โณ Pending}
|
|
92
|
+
**Progress**: ${UI_PROGRESS:0}%
|
|
93
|
+
**Estimated Duration**: ${UI_DURATION:8-12 hours}
|
|
94
|
+
**Priority**: High
|
|
95
|
+
**Dependencies**: PO Agent requirements completion
|
|
96
|
+
**Parallel Execution**: Can run parallel with Domain Agent
|
|
97
|
+
|
|
98
|
+
#### Assigned Tasks:
|
|
99
|
+
- [ ] **UI-001**: Responsive screen layout design and implementation
|
|
100
|
+
- [ ] **UI-002**: Reusable widget component creation following design system
|
|
101
|
+
- [ ] **UI-003**: Accessibility features implementation (WCAG 2.1 compliance)
|
|
102
|
+
- [ ] **UI-004**: Multi-language localization support integration
|
|
103
|
+
- [ ] **UI-005**: User interaction flow design and state integration
|
|
104
|
+
- [ ] **UI-006**: Material Design 3 implementation with proper theming
|
|
105
|
+
- [ ] **UI-007**: Performance optimization for smooth UI interactions
|
|
106
|
+
|
|
107
|
+
**Quality Gates**:
|
|
108
|
+
- โ
Responsive design validated on all target screen sizes
|
|
109
|
+
- โ
Accessibility compliance verified (WCAG 2.1 AA standards)
|
|
110
|
+
- โ
Design system consistency maintained
|
|
111
|
+
- โ
Smooth user interactions with proper feedback
|
|
112
|
+
- โ
Performance benchmarks met (60fps target)
|
|
113
|
+
|
|
114
|
+
**Deliverables**:
|
|
115
|
+
- Complete screen implementations
|
|
116
|
+
- Reusable widget library components
|
|
117
|
+
- Accessibility documentation and validation
|
|
118
|
+
- Responsive design validation report
|
|
119
|
+
- UI performance metrics
|
|
120
|
+
|
|
121
|
+
**Handoff to**: Cubit Agent (state management integration)
|
|
122
|
+
|
|
123
|
+
---
|
|
124
|
+
|
|
125
|
+
### ๐ Cubit Agent (Sage) - State Management Implementation
|
|
126
|
+
**Status**: ${CUBIT_STATUS:โณ Pending}
|
|
127
|
+
**Progress**: ${CUBIT_PROGRESS:0}%
|
|
128
|
+
**Estimated Duration**: ${CUBIT_DURATION:6-8 hours}
|
|
129
|
+
**Priority**: High
|
|
130
|
+
**Dependencies**: UI Agent + Domain Agent completion
|
|
131
|
+
**Sequential Execution**: Requires both UI and Domain outputs
|
|
132
|
+
|
|
133
|
+
#### Assigned Tasks:
|
|
134
|
+
- [ ] **STATE-001**: State architecture design with Cubit pattern implementation
|
|
135
|
+
- [ ] **STATE-002**: Business logic integration with domain layer
|
|
136
|
+
- [ ] **STATE-003**: Error handling and state validation mechanisms
|
|
137
|
+
- [ ] **STATE-004**: Performance optimization and memory management
|
|
138
|
+
- [ ] **STATE-005**: State persistence and recovery implementation
|
|
139
|
+
- [ ] **STATE-006**: UI state synchronization and event handling
|
|
140
|
+
- [ ] **STATE-007**: Testing strategy for state management components
|
|
141
|
+
|
|
142
|
+
**Quality Gates**:
|
|
143
|
+
- โ
Clean state management architecture following Cubit patterns
|
|
144
|
+
- โ
Comprehensive error handling with graceful degradation
|
|
145
|
+
- โ
Performance optimized with efficient state updates
|
|
146
|
+
- โ
State persistence working correctly
|
|
147
|
+
- โ
Memory leaks prevented and validated
|
|
148
|
+
|
|
149
|
+
**Deliverables**:
|
|
150
|
+
- Complete Cubit implementations for all feature screens
|
|
151
|
+
- State management documentation
|
|
152
|
+
- Performance benchmarks and optimization report
|
|
153
|
+
- Error handling documentation
|
|
154
|
+
- State persistence validation
|
|
155
|
+
|
|
156
|
+
**Handoff to**: Data Agent (data integration)
|
|
157
|
+
|
|
158
|
+
---
|
|
159
|
+
|
|
160
|
+
### ๐๏ธ Domain Agent (Atlas) - Business Logic Implementation
|
|
161
|
+
**Status**: ${DOMAIN_STATUS:โณ Pending}
|
|
162
|
+
**Progress**: ${DOMAIN_PROGRESS:0}%
|
|
163
|
+
**Estimated Duration**: ${DOMAIN_DURATION:6-10 hours}
|
|
164
|
+
**Priority**: High
|
|
165
|
+
**Dependencies**: PO Agent requirements completion
|
|
166
|
+
**Parallel Execution**: Can run parallel with UI Agent
|
|
167
|
+
|
|
168
|
+
#### Assigned Tasks:
|
|
169
|
+
- [ ] **DOMAIN-001**: Business entity design and implementation
|
|
170
|
+
- [ ] **DOMAIN-002**: Use case implementation with Clean Architecture principles
|
|
171
|
+
- [ ] **DOMAIN-003**: Repository interface creation and contracts
|
|
172
|
+
- [ ] **DOMAIN-004**: Business rule validation and enforcement
|
|
173
|
+
- [ ] **DOMAIN-005**: Domain event design and workflow implementation
|
|
174
|
+
- [ ] **DOMAIN-006**: Value object implementation for data integrity
|
|
175
|
+
- [ ] **DOMAIN-007**: Domain service coordination and orchestration
|
|
176
|
+
|
|
177
|
+
**Quality Gates**:
|
|
178
|
+
- โ
Clean Architecture compliance verified
|
|
179
|
+
- โ
Business rules properly implemented and tested
|
|
180
|
+
- โ
Domain isolation maintained with proper boundaries
|
|
181
|
+
- โ
Use cases fully implemented and validated
|
|
182
|
+
- โ
Repository contracts properly defined
|
|
183
|
+
|
|
184
|
+
**Deliverables**:
|
|
185
|
+
- Complete domain entities with business rules
|
|
186
|
+
- Use case implementations for all feature scenarios
|
|
187
|
+
- Repository interfaces and contracts
|
|
188
|
+
- Domain service implementations
|
|
189
|
+
- Business logic documentation
|
|
190
|
+
- Domain architecture validation report
|
|
191
|
+
|
|
192
|
+
**Handoff to**: Cubit Agent (business logic integration)
|
|
193
|
+
|
|
194
|
+
---
|
|
195
|
+
|
|
196
|
+
### ๐ Data Agent (Nova) - Data Layer Implementation
|
|
197
|
+
**Status**: ${DATA_STATUS:โณ Pending}
|
|
198
|
+
**Progress**: ${DATA_PROGRESS:0}%
|
|
199
|
+
**Estimated Duration**: ${DATA_DURATION:8-12 hours}
|
|
200
|
+
**Priority**: High
|
|
201
|
+
**Dependencies**: Domain Agent repository interfaces
|
|
202
|
+
**Sequential Execution**: Requires Domain Agent completion
|
|
203
|
+
|
|
204
|
+
#### Assigned Tasks:
|
|
205
|
+
- [ ] **DATA-001**: Repository pattern implementation fulfilling domain contracts
|
|
206
|
+
- [ ] **DATA-002**: API integration layer with proper error handling
|
|
207
|
+
- [ ] **DATA-003**: Local storage and caching strategy implementation
|
|
208
|
+
- [ ] **DATA-004**: Data validation, serialization, and security measures
|
|
209
|
+
- [ ] **DATA-005**: Offline functionality and data synchronization
|
|
210
|
+
- [ ] **DATA-006**: Performance optimization for data operations
|
|
211
|
+
- [ ] **DATA-007**: Data migration and versioning strategy
|
|
212
|
+
|
|
213
|
+
**Quality Gates**:
|
|
214
|
+
- โ
Repository pattern correctly implementing domain contracts
|
|
215
|
+
- โ
API integration working with proper error handling
|
|
216
|
+
- โ
Local storage functional with appropriate caching
|
|
217
|
+
- โ
Data security measures properly implemented
|
|
218
|
+
- โ
Offline functionality validated and working
|
|
219
|
+
|
|
220
|
+
**Deliverables**:
|
|
221
|
+
- Complete repository implementations
|
|
222
|
+
- API integration code with error handling
|
|
223
|
+
- Local storage and caching implementation
|
|
224
|
+
- Data security and validation documentation
|
|
225
|
+
- Offline functionality validation
|
|
226
|
+
- Performance optimization report
|
|
227
|
+
|
|
228
|
+
**Handoff to**: Security Agent + Test Agent (parallel review and testing)
|
|
229
|
+
|
|
230
|
+
---
|
|
231
|
+
|
|
232
|
+
### ๐ Security Agent (Guardian) - Security & Compliance Implementation
|
|
233
|
+
**Status**: ${SECURITY_STATUS:โณ Pending}
|
|
234
|
+
**Progress**: ${SECURITY_PROGRESS:0}%
|
|
235
|
+
**Estimated Duration**: ${SECURITY_DURATION:4-6 hours}
|
|
236
|
+
**Priority**: Critical
|
|
237
|
+
**Dependencies**: Data layer completion
|
|
238
|
+
**Parallel Execution**: Can run parallel with Test Agent
|
|
239
|
+
|
|
240
|
+
#### Assigned Tasks:
|
|
241
|
+
- [ ] **SEC-001**: Authentication and authorization system implementation
|
|
242
|
+
- [ ] **SEC-002**: COPPA compliance validation and implementation
|
|
243
|
+
- [ ] **SEC-003**: Data encryption and protection measures
|
|
244
|
+
- [ ] **SEC-004**: Security audit logging and monitoring
|
|
245
|
+
- [ ] **SEC-005**: API security protocol validation and enhancement
|
|
246
|
+
- [ ] **SEC-006**: Input validation and sanitization implementation
|
|
247
|
+
- [ ] **SEC-007**: Privacy protection and data handling compliance
|
|
248
|
+
|
|
249
|
+
**Quality Gates**:
|
|
250
|
+
- โ
Authentication system secure and properly implemented
|
|
251
|
+
- โ
COPPA compliance fully verified and documented
|
|
252
|
+
- โ
Data encryption implemented for sensitive information
|
|
253
|
+
- โ
Security audit trail active and comprehensive
|
|
254
|
+
- โ
All security vulnerabilities identified and addressed
|
|
255
|
+
|
|
256
|
+
**Deliverables**:
|
|
257
|
+
- Complete security implementation
|
|
258
|
+
- COPPA compliance documentation and validation
|
|
259
|
+
- Security audit reports and logging system
|
|
260
|
+
- Vulnerability assessment and remediation
|
|
261
|
+
- Privacy protection validation
|
|
262
|
+
- Security testing results
|
|
263
|
+
|
|
264
|
+
**Handoff to**: Integration Validator (final security validation)
|
|
265
|
+
|
|
266
|
+
---
|
|
267
|
+
|
|
268
|
+
### ๐งช Test Agent (Trinity) - Quality Assurance Implementation
|
|
269
|
+
**Status**: ${TEST_STATUS:โณ Pending}
|
|
270
|
+
**Progress**: ${TEST_PROGRESS:0}%
|
|
271
|
+
**Estimated Duration**: ${TEST_DURATION:10-15 hours}
|
|
272
|
+
**Priority**: High
|
|
273
|
+
**Dependencies**: Data layer completion
|
|
274
|
+
**Parallel Execution**: Can run parallel with Security Agent
|
|
275
|
+
|
|
276
|
+
#### Assigned Tasks:
|
|
277
|
+
- [ ] **TEST-001**: Unit test suite creation (70% of test pyramid)
|
|
278
|
+
- [ ] **TEST-002**: Widget test implementation (20% of test pyramid)
|
|
279
|
+
- [ ] **TEST-003**: Integration test setup and execution (10% of test pyramid)
|
|
280
|
+
- [ ] **TEST-004**: Performance testing and benchmark validation
|
|
281
|
+
- [ ] **TEST-005**: Security testing and vulnerability validation
|
|
282
|
+
- [ ] **TEST-006**: Accessibility testing and compliance verification
|
|
283
|
+
- [ ] **TEST-007**: End-to-end user journey testing
|
|
284
|
+
|
|
285
|
+
**Quality Gates**:
|
|
286
|
+
- โ
Minimum 90% test coverage achieved across all layers
|
|
287
|
+
- โ
All tests passing with proper CI/CD integration
|
|
288
|
+
- โ
Performance benchmarks met and validated
|
|
289
|
+
- โ
Security tests passing with no critical vulnerabilities
|
|
290
|
+
- โ
Accessibility compliance verified through testing
|
|
291
|
+
|
|
292
|
+
**Deliverables**:
|
|
293
|
+
- Complete test suite with 90%+ coverage
|
|
294
|
+
- Test coverage reports and analysis
|
|
295
|
+
- Performance benchmark results
|
|
296
|
+
- Security testing validation
|
|
297
|
+
- Accessibility compliance report
|
|
298
|
+
- Quality assurance documentation
|
|
299
|
+
- CI/CD integration setup
|
|
300
|
+
|
|
301
|
+
**Handoff to**: Integration Validator (final quality validation)
|
|
302
|
+
|
|
303
|
+
---
|
|
304
|
+
|
|
305
|
+
### โ
Integration Validator - Final System Integration
|
|
306
|
+
**Status**: ${INTEGRATION_STATUS:โณ Pending}
|
|
307
|
+
**Progress**: ${INTEGRATION_PROGRESS:0}%
|
|
308
|
+
**Estimated Duration**: ${INTEGRATION_DURATION:4-6 hours}
|
|
309
|
+
**Priority**: Critical
|
|
310
|
+
**Dependencies**: Security Agent + Test Agent completion
|
|
311
|
+
**Sequential Execution**: Final integration after all other agents
|
|
312
|
+
|
|
313
|
+
#### Assigned Tasks:
|
|
314
|
+
- [ ] **INT-001**: Complete system integration validation
|
|
315
|
+
- [ ] **INT-002**: Dependency injection configuration and validation
|
|
316
|
+
- [ ] **INT-003**: Provider hierarchy setup and testing
|
|
317
|
+
- [ ] **INT-004**: Final system performance validation
|
|
318
|
+
- [ ] **INT-005**: Deployment readiness assessment and documentation
|
|
319
|
+
- [ ] **INT-006**: Integration error prevention and resolution
|
|
320
|
+
- [ ] **INT-007**: Final quality assurance and sign-off
|
|
321
|
+
|
|
322
|
+
**Quality Gates**:
|
|
323
|
+
- โ
All system components properly integrated without errors
|
|
324
|
+
- โ
No integration failures or initialization problems
|
|
325
|
+
- โ
System performance meets all specified requirements
|
|
326
|
+
- โ
Deployment package ready and validated
|
|
327
|
+
- โ
Complete quality assurance sign-off obtained
|
|
328
|
+
|
|
329
|
+
**Deliverables**:
|
|
330
|
+
- Integration validation comprehensive report
|
|
331
|
+
- Deployment documentation and procedures
|
|
332
|
+
- System performance metrics and validation
|
|
333
|
+
- Final quality assurance certification
|
|
334
|
+
- Deployment readiness confirmation
|
|
335
|
+
- Integration troubleshooting guide
|
|
336
|
+
|
|
337
|
+
**Result**: Feature ready for production deployment
|
|
338
|
+
|
|
339
|
+
---
|
|
340
|
+
|
|
341
|
+
## ๐ Progress Tracking & Metrics
|
|
342
|
+
|
|
343
|
+
### Overall Feature Progress: ${COMPLETION_PERCENTAGE:0}% Complete
|
|
344
|
+
```
|
|
345
|
+
${PROGRESS_BAR:๐ช๐ช๐ช๐ช๐ช๐ช๐ช๐ช๐ช๐ช} ${COMPLETION_PERCENTAGE:0}/100%
|
|
346
|
+
```
|
|
347
|
+
|
|
348
|
+
### Agent Progress Overview:
|
|
349
|
+
- ๐ **PO Agent**: ${PO_STATUS:โณ Not Started} (${PO_COMPLETED_TASKS:0}/${PO_TOTAL_TASKS:7} tasks)
|
|
350
|
+
- ๐จ **UI Agent**: ${UI_STATUS:โณ Not Started} (${UI_COMPLETED_TASKS:0}/${UI_TOTAL_TASKS:7} tasks)
|
|
351
|
+
- ๐ **Cubit Agent**: ${CUBIT_STATUS:โณ Not Started} (${CUBIT_COMPLETED_TASKS:0}/${CUBIT_TOTAL_TASKS:7} tasks)
|
|
352
|
+
- ๐๏ธ **Domain Agent**: ${DOMAIN_STATUS:โณ Not Started} (${DOMAIN_COMPLETED_TASKS:0}/${DOMAIN_TOTAL_TASKS:7} tasks)
|
|
353
|
+
- ๐ **Data Agent**: ${DATA_STATUS:โณ Not Started} (${DATA_COMPLETED_TASKS:0}/${DATA_TOTAL_TASKS:7} tasks)
|
|
354
|
+
- ๐ **Security Agent**: ${SECURITY_STATUS:โณ Not Started} (${SECURITY_COMPLETED_TASKS:0}/${SECURITY_TOTAL_TASKS:7} tasks)
|
|
355
|
+
- ๐งช **Test Agent**: ${TEST_STATUS:โณ Not Started} (${TEST_COMPLETED_TASKS:0}/${TEST_TOTAL_TASKS:7} tasks)
|
|
356
|
+
- โ
**Integration Validator**: ${INTEGRATION_STATUS:โณ Not Started} (${INTEGRATION_COMPLETED_TASKS:0}/${INTEGRATION_TOTAL_TASKS:7} tasks)
|
|
357
|
+
|
|
358
|
+
### Quality Gates Status:
|
|
359
|
+
- ๐ฆ **Requirements**: ${QG_REQUIREMENTS:โ Not Started}
|
|
360
|
+
- ๐ฆ **UI Implementation**: ${QG_UI:โ Not Started}
|
|
361
|
+
- ๐ฆ **State Management**: ${QG_CUBIT:โ Not Started}
|
|
362
|
+
- ๐ฆ **Domain Logic**: ${QG_DOMAIN:โ Not Started}
|
|
363
|
+
- ๐ฆ **Data Layer**: ${QG_DATA:โ Not Started}
|
|
364
|
+
- ๐ฆ **Security Compliance**: ${QG_SECURITY:โ Not Started}
|
|
365
|
+
- ๐ฆ **Testing Coverage**: ${QG_TESTING:โ Not Started}
|
|
366
|
+
- ๐ฆ **System Integration**: ${QG_INTEGRATION:โ Not Started}
|
|
367
|
+
|
|
368
|
+
## ๐ Execution Strategy & Next Steps
|
|
369
|
+
|
|
370
|
+
### Current Phase: ${CURRENT_PHASE:Planning}
|
|
371
|
+
**Next Action**: ${NEXT_ACTION:Activate PO Agent for requirements analysis}
|
|
372
|
+
|
|
373
|
+
### Immediate Tasks:
|
|
374
|
+
1. **Initialize PO Agent** to begin comprehensive requirements analysis
|
|
375
|
+
2. **Validate feature definition** and ensure all necessary information is available
|
|
376
|
+
3. **Prepare parallel execution** for UI Agent + Domain Agent after PO completion
|
|
377
|
+
4. **Monitor progress** and update task status as agents complete their work
|
|
378
|
+
5. **Coordinate quality gates** to ensure standards are maintained
|
|
379
|
+
|
|
380
|
+
### Parallel Execution Opportunities:
|
|
381
|
+
${PARALLEL_OPPORTUNITIES:
|
|
382
|
+
- **Phase 2**: UI Agent + Domain Agent (after PO completion)
|
|
383
|
+
- **Phase 5**: Security Agent + Test Agent (after data layer completion)
|
|
384
|
+
- **Continuous**: Security reviews during implementation phases
|
|
385
|
+
}
|
|
386
|
+
|
|
387
|
+
### Risk Mitigation:
|
|
388
|
+
${RISK_MITIGATION:
|
|
389
|
+
- Regular state backup for crash recovery
|
|
390
|
+
- Quality gate validation before phase transitions
|
|
391
|
+
- Continuous integration validation
|
|
392
|
+
- Performance monitoring throughout development
|
|
393
|
+
}
|
|
394
|
+
|
|
395
|
+
## ๐ Implementation History
|
|
396
|
+
|
|
397
|
+
### ${CREATED_DATE} - Task Breakdown Created
|
|
398
|
+
- โ
FeatureMaster completed comprehensive feature analysis
|
|
399
|
+
- โ
Task breakdown created with detailed agent assignments
|
|
400
|
+
- โ
Parallel execution strategy designed for optimal efficiency
|
|
401
|
+
- โ
Quality gates established for each development phase
|
|
402
|
+
- โ
Implementation plan approved and ready for execution
|
|
403
|
+
|
|
404
|
+
### Next Update: After PO Agent completion
|
|
405
|
+
|
|
406
|
+
---
|
|
407
|
+
|
|
408
|
+
**๐ค Generated by FeatureMaster** | **๐ Auto-updated by AppIQ Workflow System**
|
|
409
|
+
**๐ Commands**: Use `*update-progress`, `*track-history`, `*coordinate-agents`
|
|
410
|
+
**๐พ State Management**: Automatic backup and crash recovery enabled
|
|
411
|
+
**๐ Live Updates**: This document updates automatically as agents progress
|
|
412
|
+
|
|
413
|
+
**Last Updated**: ${UPDATED_DATE} by ${LAST_UPDATED_BY:FeatureMaster}
|
|
414
|
+
**Next Review**: After each agent completion
|
|
415
|
+
**Quality Assurance**: All tasks must pass quality gates before deployment
|