@99x-ai-dlc/idf-installer 0.0.0-stage → 0.2.8

This diff represents the content of publicly available package versions that have been released to one of the supported registries. The information contained in this diff is provided for informational purposes only and reflects changes between package versions as they appear in their respective public registries.
Files changed (49) hide show
  1. package/README.md +51 -2
  2. package/bin/idf-installer.js +185 -0
  3. package/package.json +22 -4
  4. package/repository-agents/process-diagnostic-agent/review-guide.md +669 -0
  5. package/repository-agents/process-diagnostic-agent/role-play.md +223 -0
  6. package/repository-agents/process-diagnostic-agent/skills/trend-analysis.md +113 -0
  7. package/repository-agents/process-estimation-agent/estimate.md +69 -0
  8. package/repository-agents/process-estimation-agent/estimation-guide.md +435 -0
  9. package/repository-agents/process-migration-agent/migrate.md +72 -0
  10. package/repository-agents/process-migration-agent/migration-guide.md +490 -0
  11. package/repository-agents/process-onboarding-agent/external-skills/README.md +189 -0
  12. package/repository-agents/process-onboarding-agent/external-skills/ux-os.md +92 -0
  13. package/repository-agents/process-onboarding-agent/onboard.md +214 -0
  14. package/repository-agents/process-onboarding-agent/ops/build/backlog.md +43 -0
  15. package/repository-agents/process-onboarding-agent/ops/build/bolts/_template.md +53 -0
  16. package/repository-agents/process-onboarding-agent/ops/build/units/_template.md +112 -0
  17. package/repository-agents/process-onboarding-agent/ops/inception/codebase-findings/README.md +22 -0
  18. package/repository-agents/process-onboarding-agent/ops/inception/codebase-findings/_template.md +34 -0
  19. package/repository-agents/process-onboarding-agent/ops/inception/dependency-map.md +47 -0
  20. package/repository-agents/process-onboarding-agent/ops/inception/elaborations/_template.md +46 -0
  21. package/repository-agents/process-onboarding-agent/ops/inception/intents/README.md +9 -0
  22. package/repository-agents/process-onboarding-agent/ops/inception/intents/_template.md +92 -0
  23. package/repository-agents/process-onboarding-agent/ops/operate/improvements/_template.md +51 -0
  24. package/repository-agents/process-onboarding-agent/ops/operate/incidents/_template.md +61 -0
  25. package/repository-agents/process-onboarding-agent/ops/operate/retros/_template.md +122 -0
  26. package/repository-agents/process-onboarding-agent/rules/engagement.md +70 -0
  27. package/repository-agents/process-onboarding-agent/setup-guide.md +1409 -0
  28. package/repository-agents/process-onboarding-agent/skills/ai-hub-metrics.md +341 -0
  29. package/repository-agents/process-onboarding-agent/skills/bolt-risk-assessment.md +208 -0
  30. package/repository-agents/process-onboarding-agent/skills/bug-bolt.md +105 -0
  31. package/repository-agents/process-onboarding-agent/skills/compact-docs.md +123 -0
  32. package/repository-agents/process-onboarding-agent/skills/dependency-audit.md +187 -0
  33. package/repository-agents/process-onboarding-agent/skills/design-session.md +230 -0
  34. package/repository-agents/process-onboarding-agent/skills/governance-map.md +212 -0
  35. package/repository-agents/process-onboarding-agent/skills/hotfix-bolt.md +102 -0
  36. package/repository-agents/process-onboarding-agent/skills/knowledge-promotion.md +188 -0
  37. package/repository-agents/process-onboarding-agent/skills/new-engineer-induction.md +303 -0
  38. package/repository-agents/process-onboarding-agent/skills/nfr-bolt.md +117 -0
  39. package/repository-agents/process-onboarding-agent/skills/notifications.md +456 -0
  40. package/repository-agents/process-onboarding-agent/skills/process-health.md +252 -0
  41. package/repository-agents/process-onboarding-agent/skills/process-visualization.md +157 -0
  42. package/repository-agents/process-onboarding-agent/skills/product-engineering-essentials.md +261 -0
  43. package/repository-agents/process-onboarding-agent/skills/progress-digest.md +184 -0
  44. package/repository-agents/process-onboarding-agent/skills/release-readiness-checklist.md +259 -0
  45. package/repository-agents/process-onboarding-agent/skills/root-cause-analysis.md +151 -0
  46. package/repository-agents/process-onboarding-agent/skills/solution-shaping.md +98 -0
  47. package/repository-agents/process-onboarding-agent/skills/uat.md +267 -0
  48. package/repository-agents/process-skills-agent/onboard.md +68 -0
  49. package/repository-agents/process-skills-agent/skills-guide.md +404 -0
@@ -0,0 +1,259 @@
1
+ # Skill: Release Readiness Checklist
2
+
3
+ **Purpose:** Walk the engineer through the UAT Release Checklist or the Production Release Checklist item by item, one at a time, to get deliberate individual attention on every parameter before a release goes out — not a single glance-and-approve. Record the engineer's stated status for every item and produce a report at the end.
4
+
5
+ **This is a self-attestation record, not an evidence audit.** Unlike `product-engineering-essentials.md`, this skill never inspects the repository, CI logs, config, or any other artifact to verify a claim. The engineer states the status of each item; the AI's job is to ask, listen, record accurately, and move to the next item — never to second-guess, argue with, or independently verify what the engineer reports. It also never blocks a release: it surfaces the self-reported state so the people who actually approve the release (technical owner, QA, security, product, operations — as named in the checklist's own approval section) can decide with full information.
6
+
7
+ **Not the same as `uat.md`.** `uat.md` runs a stakeholder demo session to validate feature *behavior* against acceptance criteria. This skill checks release *mechanics* — build integrity, test completion, security scans, database changes, deployment and rollback readiness, environment availability, and sign-offs — for a specific UAT or production release. The two are complementary and may both run before the same release; neither depends on the other.
8
+
9
+ **Trigger:** engineer invokes directly — "run the UAT release checklist", "run the production release checklist", "release readiness check", "pre-release checklist", "check release readiness for [version]". Never run automatically or on a schedule — it starts only when the engineer asks for it.
10
+
11
+ ---
12
+
13
+ ## Step 1 — Choose the Checklist and Identify the Release
14
+
15
+ Ask:
16
+
17
+ > "Which checklist should I run — the **UAT Release Checklist** or the **Production Release Checklist**? And what release is this for — a version/build number, and a target date if you have one?"
18
+
19
+ Record:
20
+ - Checklist type (UAT or Production)
21
+ - Release version/build identifier
22
+ - Target release date
23
+ - Engineer running the checklist (and reviewer/approver name if different)
24
+ - If AI-DLC is installed and this release maps to a specific intent or bolt, the intent/bolt name (optional — ask once, do not chase it if the engineer doesn't have one handy). When supplied, carry it into the Step 3 report header (`Intent/Bolt:` line) — it's captured here so it stays traceable, not just for record-keeping in this step.
25
+
26
+ ---
27
+
28
+ ## Step 2 — Walk Through Every Item, One at a Time
29
+
30
+ Explain the format before starting:
31
+
32
+ > "I'll go through the checklist section by section, one item at a time. For each item, tell me: **Confirmed**, **Not confirmed**, or **N/A**. If it's Not confirmed, I'll ask what's blocking it. If N/A, give me a one-line reason so the record is useful to anyone reading it later."
33
+
34
+ Then work through the checklist in **Reference Checklists** below, in order, section by section.
35
+
36
+ **Rules for this step:**
37
+
38
+ - Present one item at a time and wait for an explicit response. Never infer or assume a status for an item the engineer hasn't addressed yet.
39
+ - If the engineer answers several items in one message (e.g., "1 through 4 confirmed, 5 not — no rollback script yet"), accept it, record each addressed item, and continue with whatever in that section is still unaddressed. Do not require strict one-message-per-item if the engineer is moving faster on their own.
40
+ - **Not confirmed:** ask "What's blocking this, or what needs to happen before it can be confirmed?" Record the answer as the blocker note for that item.
41
+ - **N/A:** ask for a one-line reason it doesn't apply to this release. Record it.
42
+ - Do not skip a section without the engineer explicitly opting out of it (e.g., "skip Database & Configuration, no data changes this release") — record that as a section-level N/A with the stated reason, applied to every item in the section.
43
+ - Do not editorialize on an answer, suggest the engineer is wrong, or supply your own assessment of whether an item is "really" done. If something the engineer says sounds concerning (e.g., "confirmed" for rollback validated but they mention in passing it's never been tested), you may ask a clarifying follow-up question, but the recorded status is always what the engineer states after that follow-up — never your own inference.
44
+
45
+ ---
46
+
47
+ ## Reference Checklists
48
+
49
+ **Maintenance note:** several items appear word-for-word in both checklists below (e.g. "Unit tests passed", "Rollback procedure documented"). If you edit an item's wording or threshold, check whether the same item exists in the other checklist and update it there too — the two lists are intentionally separate (production has more sections) but shared items should stay in sync.
50
+
51
+ ### UAT Release Checklist
52
+
53
+ **1. Build & Code**
54
+ - Correct release version/build identified
55
+ - All code changes merged and code review completed
56
+ - CI/CD build completed successfully
57
+ - Release branch/tag created
58
+ - Correct deployment artifact confirmed
59
+
60
+ **2. Testing**
61
+ - Unit tests passed
62
+ - Integration/API tests passed
63
+ - Regression tests passed
64
+ - End-to-end tests passed where applicable
65
+ - No open critical/blocking defects
66
+ - Known issues documented
67
+
68
+ **3. Security**
69
+ - SAST/security scans completed
70
+ - Dependency/vulnerability scan completed
71
+ - No unresolved critical/high vulnerabilities
72
+ - Security exceptions formally approved where applicable
73
+
74
+ **4. Database & Configuration**
75
+ - Database changes reviewed
76
+ - Database migration scripts tested
77
+ - Configuration changes reviewed
78
+ - Required environment variables/secrets configured
79
+ - External integrations available and validated
80
+
81
+ **5. Deployment**
82
+ - UAT deployment procedure validated
83
+ - Deployment dependencies confirmed
84
+ - Rollback procedure documented
85
+ - Rollback procedure validated where applicable
86
+
87
+ **6. UAT Readiness**
88
+ - UAT test data is available
89
+ - UAT environment is available and stable
90
+ - UAT test cases/scenarios are prepared
91
+ - UAT users/business testers are informed
92
+ - Release notes provided
93
+ - Known limitations communicated
94
+
95
+ **7. Release Approval**
96
+ - Technical owner approval obtained
97
+ - QA approval obtained
98
+ - Release/change ticket updated
99
+ - UAT deployment approved
100
+
101
+ ### Production Release Checklist
102
+
103
+ **1. UAT & Release Scope**
104
+ - UAT completed successfully
105
+ - Business/UAT sign-off obtained
106
+ - Exact production scope confirmed
107
+ - Release version/build is frozen
108
+ - Production artifact/version verified
109
+ - Release notes finalized
110
+
111
+ **2. Code & Testing**
112
+ - All production code changes approved
113
+ - CI/CD build completed successfully
114
+ - Unit tests passed
115
+ - Integration/API tests passed
116
+ - Regression tests passed
117
+ - End-to-end tests passed where applicable
118
+ - No unresolved critical/blocking defects
119
+ - Known issues documented and accepted where applicable
120
+
121
+ **3. Security & Compliance**
122
+ - Security scans completed
123
+ - Dependency/vulnerability scans completed
124
+ - No unresolved critical/high vulnerabilities
125
+ - Security exceptions formally approved where applicable
126
+ - Required compliance/privacy checks completed
127
+
128
+ **4. Database & Data**
129
+ - Production database migration scripts reviewed
130
+ - Database migration tested in a production-like environment
131
+ - Migration execution order confirmed
132
+ - Data migration/transformation validated
133
+ - Database backup completed/verified where required
134
+ - Database rollback/recovery approach confirmed
135
+
136
+ **5. Infrastructure & Configuration**
137
+ - Production infrastructure is ready
138
+ - Capacity/performance requirements verified
139
+ - Production configuration reviewed
140
+ - Secrets/credentials validated
141
+ - External dependencies/integrations validated
142
+ - Feature flags/configuration have the correct production state
143
+
144
+ **6. Deployment & Rollback**
145
+ - Production deployment procedure documented
146
+ - Deployment steps reviewed
147
+ - Deployment dependencies identified
148
+ - Rollback procedure documented
149
+ - Rollback/recovery approach validated
150
+ - Deployment window approved
151
+ - Required change-management approval obtained
152
+
153
+ **7. Monitoring & Operations**
154
+ - Application monitoring configured
155
+ - Infrastructure monitoring configured
156
+ - Logging verified
157
+ - Alerts configured and tested
158
+ - Key business metrics identified
159
+ - Post-deployment health checks defined
160
+ - Support/operations team notified
161
+ - On-call/escalation contacts confirmed
162
+ - Incident management process available
163
+
164
+ **8. Communication**
165
+ - Stakeholders informed of release
166
+ - Expected downtime/impact communicated
167
+ - Release notes published
168
+ - Support team provided with known issues/workarounds
169
+ - Customer/user communication completed where required
170
+
171
+ **9. Final Production Approval**
172
+ - QA approval obtained
173
+ - Technical/Engineering approval obtained
174
+ - Product/Business approval obtained
175
+ - Security approval obtained where required
176
+ - Operations/Infrastructure approval obtained where required
177
+ - Final release authorization obtained
178
+
179
+ **10. Post-Release Validation**
180
+ - Deployment completed successfully
181
+ - Application health checks passed
182
+ - Critical user journeys/smoke tests passed
183
+ - Database/application logs checked
184
+ - Monitoring and alerts checked
185
+ - No critical production errors observed
186
+ - Business validation completed where required
187
+ - Release/change ticket closed or updated
188
+
189
+ ---
190
+
191
+ ## Step 3 — Produce the Report
192
+
193
+ Present the full report in the conversation:
194
+
195
+ ```
196
+ ─────────────────────────────────────────────────────
197
+ [UAT | Production] Release Checklist
198
+ Release: [version/build]
199
+ Target date: [target release date from Step 1]
200
+ Checked on: YYYY-MM-DD (date this checklist was run)
201
+ Engineer: [name]
202
+ Approver: [name, if different]
203
+ Intent/Bolt: [name, if supplied in Step 1 — omit line if not]
204
+ ─────────────────────────────────────────────────────
205
+
206
+ 1. [SECTION NAME] [X confirmed / Y not confirmed / Z n/a]
207
+ ✅ [item]
208
+ ❌ [item] — Blocker: [reason given]
209
+ — [item] — N/A: [reason given]
210
+ ...
211
+
212
+ [... one block per section, in checklist order ...]
213
+
214
+ ─────────────────────────────────────────────────────
215
+ SUMMARY
216
+
217
+ | Section | Confirmed | Not confirmed | N/A |
218
+ |---|---|---|---|
219
+ | 1. [Section name] | X | X | X |
220
+ | ... | | | |
221
+
222
+ Total: [X] / [Y] items confirmed
223
+
224
+ ─────────────────────────────────────────────────────
225
+ ITEMS REQUIRING ATTENTION
226
+
227
+ [Every Not-confirmed item, grouped by section, with its blocker note.
228
+ Or: "None — every item was confirmed or explicitly marked N/A."]
229
+
230
+ ─────────────────────────────────────────────────────
231
+ This is a self-reported record, not a verified audit — it reflects what the
232
+ engineer stated, not independent confirmation. It does not authorize or block
233
+ this release; that decision belongs to whoever holds sign-off per the
234
+ checklist's own approval section. Use it as the explicit, attributable record
235
+ of what was checked before this release went out.
236
+ ─────────────────────────────────────────────────────
237
+ ```
238
+
239
+ ---
240
+
241
+ ## Step 4 — Offer to Save and Follow Up
242
+
243
+ Ask:
244
+
245
+ > "Should I save this report, and would you like any 'Not confirmed' items turned into tracked units so they don't get lost before the release?"
246
+
247
+ - If yes to saving: write the report to `{FRAMEWORK_ROOT}/ops/operate/release-checklist-[uat|prod]-YYYY-MM-DD-[version-slug].md` if AI-DLC is installed, or to a path the engineer names otherwise. `[version-slug]` is the release version/build identifier from Step 1, slugified (lowercase, non-alphanumerics replaced with `-`) — this keeps same-day reports for different releases (e.g. a morning UAT run and an afternoon hotfix) from overwriting each other.
248
+ - If yes to backlog items: for each Not-confirmed item the engineer selects, create a unit with the item and its blocker note as context — do not auto-create units for items the engineer didn't select.
249
+ - If AI-DLC is installed: create it under `{FRAMEWORK_ROOT}/ops/build/units/` following the existing unit template.
250
+ - If AI-DLC is not installed: there is no unit template or backlog to target. Instead, append each selected item to the saved report (or to a path the engineer names) as a plain "Follow-up items" list with the item text and blocker note — do not invent a unit file structure.
251
+ - If the engineer declines both, that's a complete and valid outcome — confirm the checklist run is done and move on.
252
+
253
+ ---
254
+
255
+ ## Step 5 — Handoff
256
+
257
+ Close with:
258
+
259
+ > "That's the [UAT | Production] release checklist. It's a recorded self-attestation, not a gate — the release decision still belongs to whoever signs off per the checklist's approval section. Run this again for the next release rather than reusing this report; a checklist confirmed for one build doesn't carry over to another."
@@ -0,0 +1,151 @@
1
+ # Skill: Root Cause Analysis
2
+
3
+ **Purpose:** Analyse resolved incidents and filed improvements to surface deeper root causes beyond the immediate fix. Identifies structural gaps in solution design, technology selection, and process that make the system or team vulnerable to a class of failures — not just the specific instance that was fixed.
4
+
5
+ **Trigger:** Engineer-initiated, or triggered by the AI agent when:
6
+ - An incident is marked Resolved and the engineer has not already run this skill on it
7
+ - The Post-Retro Improvement Workflow surfaces a pattern that points to a systemic issue
8
+ - The engineer says something like "run root-cause-analysis on [incident/improvement]" or "analyse what's behind these recurring failures"
9
+
10
+ **Never run automatically.** The agent may suggest running this skill, but must wait for the engineer to confirm before starting.
11
+
12
+ ---
13
+
14
+ ## Step 1 — Define the Scope
15
+
16
+ Ask the engineer:
17
+
18
+ > "Should I analyse a single incident or improvement file, or look across multiple to surface patterns? If multiple, tell me which files or which time range to cover."
19
+
20
+ Read each file in scope fully before proceeding. Do not begin analysis on partial information.
21
+
22
+ ---
23
+
24
+ ## Step 2 — Extract Surface Findings
25
+
26
+ For each file in scope, extract:
27
+ - **Symptom** — what broke or what gap was identified
28
+ - **Immediate fix** — what was done to resolve it
29
+ - **Improvement filed** — what rule/guideline change was triggered (if any)
30
+
31
+ Present a summary table before proceeding:
32
+
33
+ ```
34
+ | File | Symptom | Immediate fix | Improvement filed |
35
+ ```
36
+
37
+ Confirm with the engineer that the surface findings are accurate before moving to root cause analysis.
38
+
39
+ ---
40
+
41
+ ## Step 3 — Apply 5-Whys Analysis
42
+
43
+ For each distinct failure, build a Why chain. Start from the symptom and ask "Why did this happen?" of each answer until you reach a cause that cannot be explained by another "because" within the team's control — typically 3–5 levels deep.
44
+
45
+ Document each chain explicitly:
46
+
47
+ ```
48
+ Symptom: [what broke]
49
+ Why 1: [symptom] happened because [cause 1]
50
+ Why 2: [cause 1] happened because [cause 2]
51
+ Why 3: [cause 2] happened because [root cause]
52
+ Root cause: [statement]
53
+ ```
54
+
55
+ Stop the chain when you reach one of the three root cause categories defined in Step 4. Do not continue past the team's control boundary (e.g. "the cloud provider had an outage" is a boundary; "we had no fallback when the provider failed" is not).
56
+
57
+ ---
58
+
59
+ ## Step 4 — Classify Root Causes
60
+
61
+ Assign each root cause to one or more of the following categories:
62
+
63
+ | Category | What it means | Example signals |
64
+ |---|---|---|
65
+ | **Solution Design** | The architecture, data model, boundary, or feature design made this class of failure structurally likely | Missing validation layer, wrong responsibility boundary, tightly coupled modules, missing idempotency, incorrect API contract assumed |
66
+ | **Technology Selection** | A chosen technology has fundamental characteristics that contributed to the failure and were not accounted for | ORM behaviour under concurrent load, framework routing edge cases, third-party API rate limits or reliability, library version constraint conflicts |
67
+ | **Process** | A gap in the team's workflow, ceremonies, or standards allowed the failure to be introduced or reach production | Missing AC type, quality gate not enforced, review step skipped, test coverage blind spot, no rollback plan, unclear ownership |
68
+
69
+ A single root cause may span more than one category — record all that apply.
70
+
71
+ ---
72
+
73
+ ## Step 5 — Pattern Analysis (multi-file scope only)
74
+
75
+ If analysing more than one file, group root causes across all chains and identify:
76
+ - Root causes that appear in more than one incident or improvement (recurring vulnerability)
77
+ - Root cause categories that dominate (signals a systemic weakness in design, technology choices, or process)
78
+ - Failures where the same root cause produced different surface symptoms (masked recurrence)
79
+
80
+ Present a pattern table:
81
+
82
+ ```
83
+ | Root cause | Category | Files affected | Risk if unaddressed |
84
+ ```
85
+
86
+ Flag any pattern where the same root cause has already produced two or more distinct failures — these are the highest priority recommendations.
87
+
88
+ ---
89
+
90
+ ## Step 6 — Produce the RCA Report
91
+
92
+ Write a structured report containing:
93
+
94
+ 1. **Scope** — files analysed, date range covered
95
+ 2. **Surface findings** — table from Step 2
96
+ 3. **Root cause chains** — one Why chain per distinct failure
97
+ 4. **Classification** — root causes grouped by category (Solution Design / Technology / Process)
98
+ 5. **Patterns** — cross-cutting vulnerabilities if multi-file scope; write "Single file — no pattern analysis" otherwise
99
+ 6. **Recommendations** — for each root cause, one of three types:
100
+
101
+ | Recommendation type | What it means | Artifact to create |
102
+ |---|---|---|
103
+ | **Redesign** | A design or architectural decision must change | New intent file; update `process-onboarding-agent/rules/architecture.md` with an ADR |
104
+ | **Technology mitigation** | A technology limitation must be documented and worked around | ADR in `process-onboarding-agent/rules/architecture.md`; new intent if a replacement is warranted |
105
+ | **Process fix** | A workflow, gate, or standard must change | Improvement file via the standard Post-Retro Improvement Workflow |
106
+
107
+ Present the report to the engineer and get explicit approval on each recommendation before creating any artifact.
108
+
109
+ ---
110
+
111
+ ## Step 7 — Create Linked Artifacts
112
+
113
+ For each approved recommendation:
114
+
115
+ **Redesign or technology mitigation:**
116
+ 1. Create a new intent file at `process-onboarding-agent/ops/inception/intents/YYYY-MM-DD-<unix_timestamp>-rca-[slug].md`
117
+ 2. Populate the "Why" section with the root cause statement from Step 3
118
+ 3. Populate "What" with the recommended design or technology change
119
+ 4. Add to the Open section of `process-onboarding-agent/ops/build/backlog.md` using a reference-style link
120
+
121
+ **Process fix:**
122
+ 1. Create an improvement file at `process-onboarding-agent/ops/operate/improvements/YYYY-MM-DD-<unix_timestamp>-rca-[slug].md`
123
+ 2. Apply the change to the target file immediately (`rules/`, `skills/`, or `guidelines/`)
124
+ 3. Mark the improvement Applied
125
+
126
+ **For all artifacts:**
127
+ - Add a link back to the RCA report in the source incident or improvement file under a new "RCA" field
128
+ - If a root cause spans multiple source files, link the RCA report from each of them
129
+
130
+ ---
131
+
132
+ ## Step 8 — Report
133
+
134
+ Present a completion summary:
135
+
136
+ ```
137
+ Root Cause Analysis complete.
138
+
139
+ Files analysed: [N]
140
+ Root cause chains identified: [N]
141
+ - Solution Design: [N]
142
+ - Technology Selection: [N]
143
+ - Process: [N]
144
+
145
+ Recommendations approved: [N]
146
+ - New intent files created: [list]
147
+ - Improvement files created and applied: [list]
148
+ - ADRs added to architecture.md: [N]
149
+
150
+ Patterns flagged for monitoring: [N] (recurring root causes)
151
+ ```
@@ -0,0 +1,98 @@
1
+ # Skill: Solution Shaping (Pre-Elaboration)
2
+
3
+ **Purpose:** Decide the *shape* of a solution before any design or build work begins — how general it should be, how much of it to build, and whether to build it at all. The signed-off shape is recorded on the intent and becomes binding context for the design session and elaboration that follow, so over-engineering and accidental platform-building are caught before any contract or data model is drawn.
4
+
5
+ Design Session (Phase 0 of mob elaboration) captures *what the design is*. Solution Shaping decides *what kind of solution to design*. The two are complementary: shaping first, then design within the shape.
6
+
7
+ **Trigger:** Runs after an intent is drafted and before mob elaboration. The engineer can invoke it directly at any time, and the elaboration workflow also **auto-prompts** for it at the start of a session when the intent has no recorded shape — but it is never run without the engineer's go-ahead (see the discretion note below). To invoke it directly:
8
+
9
+ > "Read `process-onboarding-agent/skills/solution-shaping.md` and shape the solution for [intent name]."
10
+
11
+ **This step runs at the developer's discretion — it is a judgment call, not a mandatory gate.** For each intent the engineer chooses to run Solution Shaping or to skip straight to mob elaboration. Nothing downstream blocks on it, and skipping it is a legitimate, expected choice for work that doesn't need it.
12
+
13
+ Use this guide to decide:
14
+
15
+ - **Run it** when the shape is not obvious — a new capability, something that could become a framework or "platform feature", a request where the answer might be "extend what we already have", "adopt an existing service", or "don't build this at all", or any decision that is expensive to reverse.
16
+ - **Skip it** when the intent is plainly small and feature-specific, the approach is already agreed, and there is no generic-vs-one-off or build-vs-buy question to settle — go straight to the design session.
17
+
18
+ Session length also scales with the request: an obviously feature-specific change may conclude in two questions; a candidate platform capability should run all five.
19
+
20
+ ---
21
+
22
+ ## Step 1 — Read and Anchor the Intent
23
+
24
+ Read the intent file fully (`What` / `Why` / `Success Looks Like` / `Assumptions` / `Out of Scope`) before saying anything. Then reflect the goal back to the engineer in one sentence:
25
+
26
+ > "I've read the intent for [intent name]. Before we design anything, I want to decide the *shape* of the solution — how general it should be and how much to build. Is this the goal: [one-sentence summary]?"
27
+
28
+ Do not proceed until the goal is agreed.
29
+
30
+ **Fast path:** If you have chosen to run it but the request turns out to be plainly small and feature-specific — no new capability, no reusable surface, no plausible existing alternative — say so, propose a brief shape record, and skip directly to Step 4 with the engineer's confirmation. Do not force all five questions onto work that doesn't need them.
31
+
32
+ ---
33
+
34
+ ## Step 2 — Shape Questions
35
+
36
+ Ask the following **one per turn**. Wait for each answer before continuing. Require a substantive answer grounded in the engineer's domain knowledge — if the answer is "whatever you think" or an immediate agreement with no added context, pause and ask for the engineer's own judgement before continuing (see `process-onboarding-agent/rules/engagement.md`).
37
+
38
+ 1. > "**Generic or feature-specific?** Is this a one-off for this feature, or the first instance of something other features will need? Name the concrete near-term reuses if you see any."
39
+
40
+ *Default to feature-specific. Build the general case only when there are at least two concrete, near-term uses — premature generalisation is one of the most common failure modes in AI-assisted delivery, because generating the general case has become cheap while maintaining it has not.*
41
+
42
+ 2. > "**Expected usage and scale.** Who uses this, how often, and over what data volume?"
43
+
44
+ *The answer determines whether the build needs indexing, pagination, caching, or asynchronous processing — or none of them.*
45
+
46
+ 3. > "**Simplest viable.** What is the smallest implementation that satisfies the intent's 'Success Looks Like'? If the approach you have in mind is bigger than that, what specifically justifies the extra?"
47
+
48
+ 4. > "**Extend, build, or buy?** Does an existing module, internal package, or third-party service already cover most of this? If so, why is extending or adopting it insufficient?"
49
+
50
+ *Both new subsystems and new dependencies need justification — check what exists before building.*
51
+
52
+ 5. > "**Reversibility.** If we chose the simple option and it turned out to be wrong, how hard would it be to change later?"
53
+
54
+ *Cheap to reverse → bias to the simple option now. Expensive to reverse (data migrations, public API contracts, cross-team interfaces) → invest in design depth up front.*
55
+
56
+ If any answer reveals that the intent's scope is wrong — too broad, too narrow, or solving the wrong problem — pause and recommend updating the intent's `What`, `Success Looks Like`, or `Out of Scope` sections before continuing.
57
+
58
+ ---
59
+
60
+ ## Step 3 — Convention and Conflict Check
61
+
62
+ Before recording the shape, check it against the project's established decisions:
63
+
64
+ - Read `process-onboarding-agent/rules/architecture.md` if it exists. If the emerging shape contradicts an existing ADR, surface the conflict immediately and resolve it before recording.
65
+ - Read `process-onboarding-agent/guidelines/forbidden-zones.md` if it exists. If the shape would touch a forbidden zone, stop and flag it.
66
+ - If neither file exists (fresh or partial installs), rely on the codebase itself and the engineer's knowledge — and flag anything that appears to duplicate an existing capability.
67
+
68
+ ---
69
+
70
+ ## Step 4 — Record the Solution Shape
71
+
72
+ Present the summary for sign-off **before writing anything**:
73
+
74
+ ```
75
+ Solution Shape — [Intent name]
76
+
77
+ Shape: Generic | Feature-specific (+ one-line reason)
78
+ Usage / scale: [summary → what it implies for the build]
79
+ Simplest viable: [the chosen minimal approach]
80
+ Extend / build / buy: [reuse X | build new because … | adopt Y]
81
+ Reversibility: [cheap | expensive → how much design depth is warranted]
82
+ Open risks: [or "none"]
83
+ ```
84
+
85
+ On confirmation:
86
+
87
+ 1. Append a `## Solution Shape` section containing the confirmed summary, dated, to the intent file — the intent instance, never `_template.md`.
88
+ 2. Add a `**Shape:**` line to the intent file's header (alongside `Status:` / `Date:` / `Owner:`), e.g. `**Shape:** Feature-specific (YYYY-MM-DD)` — so the decision is visible at a glance, mirroring the `Design:` field the design session adds.
89
+
90
+ ---
91
+
92
+ ## Step 5 — Handoff
93
+
94
+ State clearly:
95
+
96
+ > "Solution shape is set and recorded on the intent. The next step is mob elaboration — the design session (Phase 0) will design *within* this shape."
97
+
98
+ Do not begin designing in this session. Stop after the shape is recorded.